background image

Rigging system description

The coupling bars can be stored on both sides on the storage pins. The locking tabs slide inside the coupling bars to

keep them in place.

 

CLICK  !

The locking tabs lugs t into notches. A yellow safety label is visible if the locking tabs are not fully engaged.

 

The top face is equiped with a 35 mm pole socket. Two stacking runners meet two runner tracks in stacked deployments.

 

SB15m rigging is compatible with KIBU-SB.

Kiva II rigging manual (EN) version 2.0

 12

Содержание KIBUII

Страница 1: ...KIVA II rigging manual EN...

Страница 2: ...manual EN version 2 0 Distribution date November 28 2016 2016 L Acoustics All rights reserved No part of this publication may be reproduced or transmitted in any form or by any means without the expre...

Страница 3: ...II array 17 Flying a Kiva II SB15m array 23 Adding a pull back under Kiva II 30 Ceiling mounting Kiva II 33 Disassembly 36 Stacking 39 Stacking Kiva II on SB15m 39 Pole mounting 45 Pole mouting Kiva I...

Страница 4: ...the safety precautions recommended by L Acoustics model the system in Soundvision and refer to the warnings in Mechanical Data section Be cautious when ying a loudspeaker con guration Always verify t...

Страница 5: ...anty Symbols The following symbols are used in this document This symbol indicates a potential risk of harm to an individual or damage to the product It can also notify the user about instructions tha...

Страница 6: ...ly As part of a continuous evolution of techniques and standards L Acoustics reserves the right to change the speci cations of its products and the content of its document without prior notice Please...

Страница 7: ...II KIVA KIBU SB Rigging frame for ying or stacking KIVA II KIVA and SB15m KIVA PULLBACK Pullback accessory for KIVA II KIVA Software applications Soundvision 3D acoustical and mechanical modeling soft...

Страница 8: ...vide the best mechanical conditions For mixed arrays refer to your Soundvision model Kiva II Con guration Rigging accessory Safe limit Maximum limit Flown KIBU SB 12 20 Flown KIBU II 12 20 Pullback KI...

Страница 9: ...Assessing the safety with Soundvision The overall safety factor of a speci c mechanical con guration always corresponds to the lowest safety factor among all the linking points Always model the syste...

Страница 10: ...e front pin and lodging pin and lodging spring loaded pin rigging arm The front linking points are locked with a spring loaded safety mechanism inside the right handle A yellow safety label is visible...

Страница 11: ...12 KIVA II 1 IN 1 IN Znom 16 USE ONLY WITH L ACOUSTICS AMPLIFIED CONTROLLERS FOR OTHER CONFIGURATIONS CHECK MECHANICAL SAFETY WITH SOUNDVISION SOFTWARE SB15m SB15m features four rigging rails on top...

Страница 12: ...s to keep them in place CLICK The locking tabs lugs t into notches A yellow safety label is visible if the locking tabs are not fully engaged The top face is equiped with a 35 mm pole socket Two stack...

Страница 13: ...m front linking points rear linking points The other side features two rigging rails and two coupling bars with two locking tabs for securing the SB15m locking tabs rigging rails coupling bars Flying...

Страница 14: ...B For optimal stability the array must be secured in front position when tilted towards the rear and in rear position when tilted towards the front Kiva II in rear position with a positive 7 5 angle T...

Страница 15: ...ing point KIET II features two dedicated rear linking points one for pole mounting and one for ceiling mounting deployment Pole mount KIET II is a rigging accessory compatible with the Kiva II rigging...

Страница 16: ...Use the spacers provided with the pole mount socket rear linking point front linking points 350 mm 13 8 in 175 mm 6 9 in 372 mm 14 6 in KIVA PULLBACK KIVA PULLBACK is used to implement pull back con...

Страница 17: ...min number of operators 2 Risk of falling objects Verify that no unattached items remain on the array On every Kiva II check that the logo is on the same side as the safety mechanism identifyable by t...

Страница 18: ...he stack With KIBU SB Use the front or rear position Select the 0 angle on the rigging arm Secure the rigging arm with the ball locking pin Front position Rear position CLICK CLICK 0 0 Final check The...

Страница 19: ...re to ensure a 0 angle Secure the rigging arm with the ball locking pin Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side to side to verify that...

Страница 20: ...ch inter enclosure angle by lifting the array Align the mark on the rigging arm with the chosen angle mark SHLAK 7 5 5 Bring a second stack of four Kiva II logos on the right hand side under the array...

Страница 21: ...ect it to the stack CLICK Set the inter enclosure angle at 0 SHLAK 0 Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side to side to verify that al...

Страница 22: ...llows 9 Connect a Kiva II logo on the right hand side under the array CLICK Set the inter enclosure angle Align the mark on the rigging arm with the chosen angle mark SHLAK 7 5 Final check The yellow...

Страница 23: ...Pickup point for pullback deployment Use hole 13 on KIBU SB for SB15m Maximum negative site angle with SB15m The negative site angle is limited by the lifting element The element must not come in cont...

Страница 24: ...BU SB Secure the coupling bars with the locking tabs CLICK Make sure the safety label on each locking tab is fully covered Make sure the lugs are in the notches 2 Lift the array 3 Position a SB15m und...

Страница 25: ...he top subwoofer Secure the coupling bars with the locking tabs CLICK Make sure the safety label on each locking tab is fully covered Make sure the lugs are in the notches 6 Repeat steps 2 p 24 to 5 p...

Страница 26: ...igging procedures 7 Secure a Kiva II logo on the left hand side on a KIBU SB coupling bars removed Front position CLICK Select the 0 angle on the rigging arm 0 Kiva II rigging manual EN version 2 0 26...

Страница 27: ...elect the 0 angle on the rigging arm 0 Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side to side to verify that all linking points are secured 2...

Страница 28: ...and secure it under the SB15m array with coupling bars Secure the coupling bars with the locking tabs CLICK Make sure the safety label on each locking tab is fully covered Make sure the lugs are in th...

Страница 29: ...e inter enclosure angle Align the mark on the rigging arm with the chosen angle mark SHLAK 7 5 Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side...

Страница 30: ...load bearing lines must be parallel to each other On every Kiva II check that the logo is on the same side as the safety mechanism identifyable by the eyelet and the handle shape Pickup point for pull...

Страница 31: ...edure 1 Secure a KIVA PULLBACK under the bottom enclosure Rotate the accessory to nd the correct locking position Secure the rear piece in the spring lock safety of the bottom enclosure SHLAK 31 Kiva...

Страница 32: ...l is not visible on the logo side Shake the assembly up and down and from side to side to verify that all linking points are secured 2 Secure a shackle to KIVA PULLBACK and lift it with an additional...

Страница 33: ...ber of operators 2 On every Kiva II check that the logo is on the same side as the safety mechanism identifyable by the eyelet and the handle shape Assembly Procedure 1 Secure KIET II pole socket remo...

Страница 34: ...the rigging arm Use the applicable rear linking point as illustrated N A N A N A 5 2 0 9 0 5 1 8 3 4 1 5 3 Final check The yellow label is not visible on the logo side Shake the assembly up and down...

Страница 35: ...e inter enclosure angle Align the mark on the rigging arm with the chosen angle mark SHLAK 7 5 Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side...

Страница 36: ...Release the rigging arm of the bottom enclosure Slightly lift the enclosure if necessary Risk of fall Carefully lower the rear of the enclosure 2 Release the enclosure Slightly lift the rear of the e...

Страница 37: ...less Kiva II Any additional enclosure must be removed one by one Minimum number of operators 2 Procedure Hold the bottom enclosure at all times 1 Set the inter enclosure angles at 0 for the four botto...

Страница 38: ...procedures 3 Release the rigging arm of the upper enclosure to disconnect the stack at the rear 4 Release the top enclosure 5 Raise the array and put the stack aside Kiva II rigging manual EN version...

Страница 39: ...e reversed element Refer to the subwoofer user manual and to the Cardioid con gurations technical bulletin for details about the use of this con guration Any of the following subwoofer arrays can be s...

Страница 40: ...f the SB15m stack Use the KIBU SB coupling bars Secure the coupling bars with the locking tabs CLICK Make sure the safety label on each locking tab is fully covered Make sure the lugs are in the notch...

Страница 41: ...pling bars removed For optimal stability prefer the rear position for a front tilting array and the front position for a rear tilting array Front position CLICK Select the site angle on the rigging ar...

Страница 42: ...e when Kiva II and KIBU SB are stacked on SB15m When Kiva II and KIBU SB are ground stacked the rigging arm cannot be secured at 7 5 7 5 5 2 5 0 2 5 3 5 4 5 5 5 6 5 7 5 Final check The yellow label is...

Страница 43: ...g arm with the chosen angle mark on the bottom enclosure SHLAK 10 Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side to side to verify that all l...

Страница 44: ...closure Risk of trapping hand ngers Carefully release the back of the enclosure until it rests on the assembly 2 Unlock the mechanism inside the left handle of the top enclosure and slide the enclosur...

Страница 45: ...13 mm hex key min number of operators 1 Pole mounting on SB15m A maximum of two Kiva II can be pole mounted on a SB15m Risk of falling objects Verify that no unattached items remain on the array Assem...

Страница 46: ...ble rear linking point as illustrated 0 2 5 5 7 5 10 11 12 13 14 15 Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side to side to verify that all...

Страница 47: ...g arm with the chosen angle mark on the bottom enclosure SHLAK 10 Final check The yellow label is not visible on the logo side Shake the assembly up and down and from side to side to verify that all l...

Страница 48: ...rm of the top enclosure Risk of trapping hand ngers Carefully release the back of the enclosure until it rests on the assembly 3 Unlock the mechanism inside the left handle of the top enclosure and sl...

Страница 49: ...installing the TEQSAS LAP TEQ inclinometer provided in the TECH TOOLCASE support plate for laser slit opening Calibrating the LAP TEQ Refer to the manufacturer instructions in the L Acoustics TECH TOO...

Страница 50: ...guide and L Fins Nominal impedance 16 Connectors IN 1 x 4 point speakON LINK 1 x 4 point speakON Rigging and handling ush tting 3 point rigging system inter enclosure angles 0 1 2 3 4 5 7 5 10 12 5 15...

Страница 51: ...Speci cations Kiva II dimensions 525 mm 20 7 in 520 mm 20 5 in 202 mm 8 in 175 mm 6 9 in 357 mm 14 in 104 mm 4 1 in 51 Kiva II rigging manual EN version 2 0...

Страница 52: ...oint speakON Rigging and handling 2 handles 2 coupling bars and 2 locking tabs 1 x 35 mm pole socket Weight net 36 kg 79 4 lb Cabinet rst grade Baltic birch plywood Front steel grill with anti corrosi...

Страница 53: ...Speci cations SB15m dimensions 520 mm 20 5 in 439 mm 17 3 in 580 mm 22 8 in 53 Kiva II rigging manual EN version 2 0...

Страница 54: ...ion rigging frame for ying Kiva Kiva II 2 12 mm shackles WLL 1 t Weight net 3 8 kg 8 4 lb Material high grade steel with anti corrosion coating KIBU II dimensions 91 mm 3 6 in 482 mm 19 in 522 mm 20 6...

Страница 55: ...stacking Kiva Kiva II and SB15m 2 12 mm shackles WLL 1 t Weight net 10 7 kg 23 6 lb Material high grade steel with anti corrosion coating KIBU SB dimensions 78 8 mm 3 1 in 72 4 mm 105 mm 4 1 in 2 9 i...

Страница 56: ...ing or pole mount of 3 Kiva Kiva II maximum Weight net 3 2 kg 7 1 lb Material high grade steel with anti corrosion coating KIET II dimensions 516 mm 20 3 in 415 mm 16 3 in 135 mm 5 3 in 47 mm 1 9 in 3...

Страница 57: ...ullback accessory for Kiva Kiva II 1 12 mm shackle WLL 1 t Weight net 2 6 kg 5 7 lb Material high grade steel with anti corrosion coating KIVA PULLBACK dimensions 25 mm 1 in 380 mm 15 in 532 mm 20 9 i...

Страница 58: ...www l acoustics com L Acoustics GmbH Steierm rker Str 3 5 70469 Stuttgart Germany 49 7 11 89660 323 L Acoustics Ltd PO Box Adler Shine Aston House Cornwall Avenue London N3 1LF United Kingdom 44 7224...

Отзывы: