Rigging procedures
This step requires three operators.
Hold the enclosure at the bottom until the rigging plates are secured.
5.
Secure an additional enclosure under the array.
a) Turn the next Kara IIi upside-down and link the enclosures at the front with rigging screws.
Do not fully tighten the screws.
b) Link the enclosures at the rear with rigging screws.
Select the holes and inserts depending on the inter-element angle.
0°
+1°
+2°
+4°
+3°
+5°
+7.5°
+10°
A
B
Kara IIi owner's manual (EN) version 2.0
71
Содержание Kara IIi
Страница 1: ...Kara IIi owner s manual EN ...
Страница 106: ...Corrective maintenance CONNECTOR PLATE HF DIAPHRAGM G03520 HF DRIVER G03521 106 Kara IIi owner s manual EN version 2 0 ...
Страница 130: ...Speci cations SB28 dimensions 700 mm 27 6 in 1300 mm 51 2 in 550 mm 21 7 in 130 Kara IIi owner s manual EN version 2 0 ...
Страница 142: ...L Acoustics 13 rue Levacher Cintrat 91460 Marcoussis France 33 1 69 63 69 63 info l acoustics com www l acoustics com ...