Rigging procedures
Rigging procedures
Rigging a Kara II downll array under a K1 array
Prerequisite
• Prepare and raise a K1 array. Refer to the
K1 rigging manual
.
• Prepare an array of three Kara II with 0° inter-enclosure angles.
Refer to the
Kara II owner's manual
.
• Position the Kara II array under the K1 array.
Make sure the latches on the bottom K1 are in storage position.
Procedure
1.
Take out the four rigging arms on the top Kara II enclosure:
a) Lock the front rigging arms in linking position.
14
Kara II downll for K1 addendum (EN) version 1.0
Содержание KARA II DOWNFILL FOR K1
Страница 1: ...KARA II DOWNFILL FOR K1 addendum EN ...