Rigging procedures
4.
On each A15-LIFT, secure a shackle to the
setup point
(hole 11).
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
setup point
FRONT
Make sure the pickup points are on hole 11 before lifting the array.
5.
Raise the array until the bottom rigging is accessible.
For this operation, stand behind the array.
6.
Connect the enclosures at the bottom.
Pull the enclosures together to align the rigging.
SHLAK!
7.
Lower the array to select the desired pickup points.
A15-LIFT pickup point
Select the same pickup point on each A15-LIFT within an array of up to 6 enclosures.
For larger arrays, refer to
Radial arrays of 7 enclosures and more
(p.95).
A15 owner's manual (EN) version 1.2
61
Содержание A15 Series
Страница 1: ...A15 owner s manual EN...
Страница 36: ...Rigging system description 36 A15 owner s manual EN version 1 2...