
̶ 29 ̶
Extension Lead test flow
2. I
nsula
tion
re
sis
ta
nce
te
st
1.
Continui
ty tes
t
Stand-by
Short press: 1 sec of continuity test
Long press: 5 sec of continuity test
Continuity test
Insulation resistance test between:
(1) L&N - E, (2) L-N
Press to halt a
measurement in
progress.
Tester performs next
switch is pressed
while a test is halted
with “FAIL” indication.
(Red backlight blinks.)
(Red backlight blinks.) (Red backlight blinks.)
(1sec.)
EXTENSION
test when Extension
Press
Extension
to start a test.
Rpe
≦1
Ω=
PASS
Rpe>
1Ω=
FAIL
L&N-E
≧
1
MΩ
=
PASS
L&N-E <1
MΩ=
FAIL
L-N <0.1
MΩ =
FAIL
Содержание KEW6205
Страница 1: ...PORTABLE APPLIANCE TESTER KEW6205 INSTRUCTION MANUAL...
Страница 2: ......
Страница 14: ...13 2 6 Optional accessories 1 Printer cable MODEL7275 2 USB cable with KEW Report Software MODEL8263 USB...
Страница 47: ......