
̶ 49 ̶
- 49 -
12. Memory function
Results measured in PV insulation resistance, voltage, insulation resistance
and earth resistance measurements can be saved in the memory of the
instrument. (max. 1000) In addition, two different location numbers can be
allocated to each data.
Parameters saved
with the results
Detail Range
Saved time
and date
Time and date when the data saved is
recorded automatically.
Note:
●
Note the measured time and date.
●
Data transfer to PC is required to view
the saved time and date.
-
Data no.
Select and allocate a data no. to save a
result. Number will automatically be
given in sequence.
0 - 999
Site no. 1
Specify and allocate a desired site no. to
a measured data. (E.g.: Give a specific
no. to the building where the measure-
ment is done.)
0 - 99
Site no. 2
Specify and allocate a desired site no. to
a measured data. (E.g.: Give a specific
no. to the distribution panel where the
measurement is done.)
0 - 99