13. FUEL INJECTION SYSTEM
13-16
People GT 200i
TILT SWITCH
INSPECTION
Support the scooter level surface.
Put the side stand up and engine stop switch
is at “RUN”.
Turn the ignition switch to “OFF”
Remove the screws, washers and tilt switch.
Place the tilt switch vertical as shown, and
turn the ignition switch to “ON”.
Measure the voltage between the following
terminals of the tilt switch connector with
the connector connected.
Terminal
Normal
Violet/Red (+) – Green/Pink (-) 5 V (ECU
voltage)
Black/Blue (+) – Green/Pink (-) 0.4
~
1.4 V
Incline the tilt switch 65±10 degrees to the
left or right with the ignition switch turned
to “ON”.
Measure the voltage between the following
terminals of the tilt switch connector with
the connector connected.
Terminal
Normal
Violet/Red (+) – Green/Pink (-) 5 V (ECU
voltage)
Black/Blue (+) – Green/Pink (-) 3.7
~
4.4 V
If repeat this test, first turn the ignition
switch to “OFF”, then turn the ignition
switch to “ON”.
REMOVAL/INSTALLATION
Disconnect the connector and remove two
screws.
Remove the Tilt switch.
Installation is in the reverse order of removal.
Tighten the mounting screws securely.
Do not disconnect the tilt switch
connector during inspection.
*
Install the tilt switch with its “UP” mark
facing up.
*
Содержание People GT 200i
Страница 11: ...1 GENERAL INFORMATION 1 8 People GT 200i TORQUE VALUES...
Страница 12: ...1 GENERAL INFORMATION 1 9 People GT 200i TORQUE VALUES FRAME...
Страница 16: ...1 GENERAL INFORMATION 1 13 People GT 200i Oil Controller Tilt Switch Front Brake Hose...
Страница 17: ...1 GENERAL INFORMATION 1 14 People GT 200i ISC Throttle Body TPS Injector MAP Sensor...
Страница 18: ...1 GENERAL INFORMATION 1 15 People GT 200i Regulator Rectifier Ignition Coil Fuel Pump...
Страница 25: ...2 EXHAUST MUFFLER FRAME COVERS 2 1 People GT 200i SCHEMATIC DRAWING...
Страница 33: ...3 INSPECTION ADJUSTMENT 3 2 People GT 200i...
Страница 57: ...6 CYLINDER HEAD VALVES 6 1 People GT 200i SCHEMATIC DRAWING...
Страница 69: ...7 CYLINDER PISTON 7 1 People GT 200i SCHEMATIC DRAWING...
Страница 78: ...8 DRIVE AND DRIVEN PULLEYS V BELT 8 1 People GT 200i SCHEMATIC DRAWING...
Страница 90: ...8 DRIVE AND DRIVEN PULLEYS V BELT 8 13 People GT 200i Install the left crankcase cover Left Crankcase Cover...
Страница 92: ...9 FINAL REDUCTION 9 1 People GT 200i SCHEMATIC DRAWING...
Страница 98: ...10 A C GENERATOR STARTER CLUTCH 10 1 People GT 200i SCHEMATIC DRAWING...
Страница 108: ...11 CRANKCASE CRANKSHAFT 11 1 People GT 200i SCHEMATIC DRAWING...
Страница 114: ...12 COOLING SYSTEM 12 1 People GT 200i SCHEMATIC DRAWING...
Страница 154: ...13 FUELINJECTION SYSTEM 27 13 27 People GT 200i FI DIAGNOSTIC TOOL OPERATION INSTRUCTIONS 3620A LEB2 E00...
Страница 169: ...14 STEERING HANDLEBAR FRONT WHEEL FRONT BRAKE FRONTSHOCKABSORBER FRONTFORK 14 1 People GT 200i SCHEMATIC DRAWING...
Страница 184: ...15 REAR BRAKE REAR FORK REAR WHEEL REAR SHOCK ABSORBER 15 1 People GT 200i SCHEMATIC DRAWING...
Страница 191: ...16 BATTERY CHARGING SYSTEM 16 1 People GT 200i CHARGING SYSTEM LAYOUT AC Generator Battery Regulator Rectifier...
Страница 199: ...17 IGNITION SYSTEM 17 1 People GT 200i IGNITION SYSTEM LAYOUT IGNITION CIRCUIT Ignition Coil Ignition Switch Tilt switch...
Страница 205: ...18 STARTING SYSTEM 18 1 People GT 200i STARTING SYSTEM LAYOUT STARTING CIRCUIT Starter Relay Ignition Switch...