13. Before installing last center panel, tighten 4 bolts at each center panel joint.
Then tighten 4 lock nuts at left and right end panel joints.
14. Install last center panel to shelter frame. After all bolts are installed, go back
and tighten 8 center panel joint bolts on the last panel.
16. Tighten panel frame bolts on each center panel (1 at top and 1 at bottom on each panel).
15. Tighten 3 panel frame bolts on each of the left and right end panels.
Push Panels
Towards Ends
Center Panel Joint
Center Panel Joint
Left End Panel Joint
Right End Panel Joint
Panel Frame Bolts
THIS UNIT MUST BE ANCHORED ACCORDING TO THESE INSTRUCTIONS AT ALL TIMES
NZ420 Rev. 12/04/19
THIS EQUIPMENT MUST BE STORED IN A SECURED, SHELTERED AREA WHEN NOT IN USE OR IN THE THREAT
OF HIGH WINDS. ANY WEATHER DAMAGE TO THIS EQUIPMENT WILL NOT BE COVERED UNDER KWIK GOAL’S
PRODUCT GUARANTEE. DO NOT LEAVE THIS EQUIPMENT UNATTENDED.