
Stand: 19.03.12
Seite 15
KW Hydraulik GmbH
Tel.:
03675/42198-0
Köppelsdorfer Str. 132
Fax:
03675/42198-11
D-96515 Sonneberg
e-mail:
Germany
Internet: www.kw-hydraulik.de
SSBZ
SSBZ
SSBZ
SSBZ
picture 13: sketch of the punching tool without latch
At first make the basic device SSBZ, according to capture 4, ready for the work. For
punching please adjust the SSBZ as followed:
Put the hole-punch reception of the punching tool with the not below on the guide
rail of the basic device (picture 1) and move the piston-bar out until the latching-bolt
is latched. Attention! Pull the latching-bolt!
After that, move the piston-bar with the complete hole-punch reception to its starting
position by pressing the button.
The die has to be put in the reception and tied up with the side screw. Take care
that the die is in the right position. The not has to be behind (see picture 13). The
height-data of the punch and the die have to agree. In each case they are at the
back
of
the
tools.
Indication! Take care that the punch and the die are in the right position for long-
punch insertions. You have to take care that the locking-screw and the centre-
sinking are at the same side by the insertion of the long-punch die into the
reception. The die is fixed in the right position automatically by tying up the screw.
After that please push the die-reception into the guiding-way from above.
For using the electronic hydraulic pump the optoelectronic sensor has to be in the
0-position, i. e. that the to the tool showing front side of the button is flush with the
fix-appliance (picture 1).
die-reception
hole-punch reception
die
punch