3 to 6 months
1. Open vise to maximum opening.
2. Loosen and remove the movable jaw.
3. Remove spiral-retaining ring from handle end of the vise
screw.
4. Remove the screw support from the vise body.
5. Remove the two-piece locking collar by removing the four
SHCS.
6. With one screw still half way out spin off the first collar.
7. Using a pin or screw reach into the second collar and spin it
off exposing the bearings.
8. Remove the thrust bearing assembly consisting of (2) thrust
washers and (1) thrust bearing from the counter bore in the end of
the body.
9. Clean and inspect the counter bore, thrust washers and thrust
bearing.
10. Apply water resistant grease to the thrust washer (i.e. Kurt
lube p/n KLA or marine grade grease)
11. Install thrust bearing assembly on the screw in the reverse
manner.
12. Install the first collar by spinning on the screw until it stops.
(
Items 12-14—See Fig. 1
)
13. Install the second collar behind the first and spin on until it
stops. At this point the screw holes may or may not be lined up.
14. Turn the second collar counterclockwise until a hole lines up.
Figure 1
The O-ring installation and the chip guard installation guides are
provided for your review. While both items are an option, we en-
courage you to read and use at your discretion. Please see these
guides for proper installation.
Содержание 3600A Series
Страница 10: ......