18
GB
357
X
1÷2
650 min.
7.2.1
7.1
12a
11
11
12a
12r
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
• Draw a horizontal line at 650 mm above the hob.
• Place bracket 7.2.1
7.2.1
7.2.1
7.2.1
7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket 7.2.1
7.2.1
7.2.1
7.2.1
7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper
chimney section supplied).
• Mark the wall at the centres of the holes in the bracket.
• Place the Hood Connector Support 7.1
7.1
7.1
7.1
7.1 on the wall as shown at 357 mm above the horizontal
reference line, making sure that the holes used to fix the corner to the wall are equidistant.
• Mark the wall at the centres of the holes in the Support.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs 11
11
11
11
11 in the holes.
• Fix the brackets and the Support using the 12a
12a
12a
12a
12a (4,2 x 44,4) screws supplied.
• Insert the two screws 12r (4,2 x 12,7) supplied in the hood body fixing holes, located on the front
plate of the Hood Connector Support, leaving a gap of 5-6 mm between the Support and the head
of the screw.