Spreading operation
B
154
AXIS-GENERAL
AXIS
20.1
AXIS
30.1 (W), AXIS 40.1 (W)
AXIS 50.1 W
B.6
Calibration test
For precise control of the discharge amount we recommend running a new cali-
bration test every time you change fertiliser types.
Run the calibration test:
Before spreading for the first time.
If the fertiliser quality has changed greatly (moisture, high dust content,
cracked grain).
If a new fertiliser type is used.
The calibration test must be conducted (with engaged PTO shaft) at a standstill
or during travel over a test section.
NOTICE
The solid fertiliser broadcaster AXIS 50.1 Q is tested for calibration using the
electronic control system.
The calibration test is described in a separate operator's manual for the elec-
tronic control system. This operator's manual is part of the electronic control
system.
NOTICE
The solid fertiliser broadcaster AXIS 50.1 W is equipped with an electronic drop
point adjustment.
The drop point is automatically moved to the calibration position by the electron-
ic control system.
Содержание AXIS 20.1
Страница 4: ......
Страница 12: ...Contents VIII...
Страница 14: ...Intended use 1 2 AXIS GENERAL...
Страница 46: ...Transport without tractor 6 34 AXIS GENERAL...
Страница 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Страница 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Страница 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Страница 214: ......
Страница 215: ......