![KUHL FC 303 GL Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/kuhl/fc-303-gl/fc-303-gl_pre-delivery-instructions_2009380011.webp)
- 10 -
TILTING THE MACHINE/PALLET ASSEMBLY
Moor the machine using two textile slings as
shown opposite. (Two strands of each sling
must have a minimum capacity of 2500 kg /
5500 lbs.).
- The sling attached onto the cutterbar must
have a length of three meters (9’10”)
- The sling attached to the pallet must have
a length of four meters (13’1”)
Position slipknots as shown in the two smaller
pictures.
Note : the slings attached to the cutterbar
must be placed between the 1
st
and 2
nd
disc
and between the 4
th
and 5
th
disc.
The 3rd sling will be attached to the rear sup-
port on the pallet.
Place two approx. 400 mm (16”) high
wedges where the cutterbar will rest once
tipped over entirely.
Using a lifting device fitted with a hook
Содержание FC 303 GL
Страница 1: ...PREDELIVERY INSTRUCTIONS FC 303 GL RGL N 95132 B GB 02 2004 ...
Страница 5: ... 4 TECHNICAL SPECIFICATIONS ...
Страница 32: ... 31 ...
Страница 33: ... 32 ...
Страница 34: ... 33 ...