- 1 -
Operating Instructions
Water Boiler of PU Series
16-001-00019 (PU-100)16-001-00020(
PU-200
)
16-001-00022 (
PU-300
CE
1
Страница 1: ... 1 Operating Instructions Water Boiler of PU Series 16 001 00019 PU 100 16 001 00020 PU 200 16 001 00022 PU 300 CE 1 ...
Страница 2: ... the machine while machine is in operation Please unplug the Cord when the Machine is being not used In the following pages all the important items are marked by for your attention Disclaimer The Manufacturer will accept no liability for any injury or damage caused by incorrect usage of the machine or by improper operation contrary to information given in this Instruction Manual Technical Data Spe...
Страница 3: ...nnected 6 Turn the Knob of Controller 7 to the temperature that you willing prefer 7 The Indicator Lamp 5 will be light up the water in the urn start to heat up 8 When the Indicator Lamp 5 lights off the brewing process is completed An urn of hot water now ready to be served 9 When the temperature cool down about 5 10 degree C than the number that you setting the System will re start to heat up au...
Страница 4: ...he Heating Element at the bottom of the Urn 2 Wait for 5 6 minutes to allow the lemon juice to run through the sediments 3 You may use a brush with soft bristles to brush the Heating Element lightly and gently 4 Repeat steps 1 3 until limestone is removed 5 Use a dry cloth to wipe the lemon juice away 6 Pour some clean water into the Urn brush the Heating Element lightly and gently until there is ...