83
REGULAR CHECKS AND MAINTENANCE WORK
EVERY 1000 SERVICE HOURS OR ONCE A
YEAR
B
Replacing Air Filter Element
Open the engine hood and remove the dust-cover.
Remove and replace the outer element and inner element
with new elements.
When reassembling, install the dust-cover so that its TOP
mark (arrow) faces up-wards.
A
Shorten the replacement period if the machine is used
in dusty or sandy areas.
EVERY 1500 SERVICE HOURS
B
Checking Fuel Injection Nozzle(Injection
Pressure)
Consult your local KUBOTA Dealer for this service.
EVERY 2000 SERVICE HOURS
Do all 50, 100, 200, 250, 500 and 1000 hour servicing at
the same time.
B
Changing Front Idler and Track Roller Oil
A
Contact your KUBOTA dealer for details.
B
Checking the Alternator and Starter Motor
A
Contact your KUBOTA dealer for details.
EVERY 3000 SERVICE HOURS
B
Checking Injection Pump
Consult your local KUBOTA Dealer for this service.
ANNUAL SERVICING
B
Electrical Wiring and Fuses
Check the terminals periodically for proper connections.
Loose wiring or damaged cables can cause improper
functioning or short circuiting of the electrical system.
Check wiring and replace damaged components
immediately. If a fuse blows out soon after having been
replaced, contact your nearest KUBOTA dealer. Never
use a fuse other than specified.
B
Checking the Electrical Circuit
Check the electrical circuitry for disconnections, shorts or
loose terminals.
B
Checking Air-Conditioner Pipes and
Hoses
To avoid personal injury:
A
Do not touch the air-conditioner hoses or the
heater with your hand. You may get burned.
1. Check to see that all lines and hose clamps are tight
and not damaged.
2. If hoses and clamps are found worn or damaged,
replace or repair them at once. (Consult your local
KUBOTA Dealer for this service.)
(1) Inner element
(2) Outer element
(3) Dust-cover
(4) Clamps
Содержание KX057-4
Страница 1: ......
Страница 15: ...7 SAFE OPERATION 6 DANGER WARNING AND CAUTION LABELS...
Страница 16: ...SAFE OPERATION 8...
Страница 17: ...9 SAFE OPERATION...
Страница 18: ...SAFE OPERATION 10...
Страница 19: ...11 SAFE OPERATION...
Страница 20: ...SAFE OPERATION 12...
Страница 22: ......
Страница 74: ...52 EXCAVATOR OPERATION...
Страница 122: ...100 LIFTING CAPACITY...
Страница 123: ...101 LIFTING CAPACITY...
Страница 124: ...102 LIFTING CAPACITY...
Страница 125: ...103 LIFTING CAPACITY...
Страница 126: ...104 LIFTING CAPACITY...
Страница 127: ...105 LIFTING CAPACITY...
Страница 128: ...106 LIFTING CAPACITY...
Страница 129: ...107 LIFTING CAPACITY...