Recovery, loading and transport
32
!
Attach the lifting gear with shackles to the lifting eyes (1) on
each side of the dozer.
!
Attach the lifting gear with shackles to the lifting eyes (1) on
each side of the boom.
!
As soon as the lifting gear is attached to the excavator, press cloths between lifting gear and excavator to
protect the excavator.
!
Always keep the machine level. Be sure that the centre line of the crane hook is aligned as exactly as possible
with the centre line of the excavator and that the lifting angle is as specified. Lift the excavator.