
4
STEP 2.
Align the trays with the holes on the cen-
ter-beam by matching the coordinating labels. Then
alternate between bolts to tighten.
3x M8x160 Bolts
4x M8 Nut
Parts Needed:
A
A
NOTE:
The trays with the “..Küat..” Logo will be
farthest from the hitch. Performing this step with the
rack upside down will ease assembly.
NOTE:
This tray has the M8x160
bolt pre-installed.
STEP 1.
Align the trays with the holes on the center
beam by matching the coordinating labels.
Alternate between bolts to tighten.
Содержание NV BASE 2.0
Страница 1: ...NV BASE 2 0 USER GUIDE NV BASE TM 2 0...
Страница 12: ...kuatracks com info kuatracks com 1 877 822 5828...