7
HANDLEBAR, CONTROLS
33
7.4
Checking the throttle cable routing
Preparatory work
–
Fold the seat up. (
–
Remove the fuel tank. (
B01712-10
Main work
–
Check the throttle cable routing.
The throttle cable must be routed to the carburetor along the back of the handle-
bar, below the seat fixing.
» If the throttle cable is not routed as specified:
–
Correct the throttle cable routing.
Finishing work
–
Install the fuel tank. (
–
Lock the seat. (
7.5
Checking the play in the throttle cable
400192-11
–
Check the throttle grip for smooth operation.
–
Move the handlebar to the straight-ahead position. Turn the throttle grip back and
forth slightly and determine the play in throttle cable
A
.
Throttle cable play
2… 3 mm (0.08… 0.12 in)
» If the throttle cable play does not meet specifications:
–
Adjust the play in the throttle cable. (
Danger
Danger of poisoning
Exhaust gases are toxic and inhaling them may result
in unconsciousness and/or death.
–
When running the engine, always make sure there is sufficient ventila-
tion, and do not start or run the engine in an enclosed space without an
effective exhaust extraction system.
–
Start the engine and let it run idle. Move the handlebar to and fro over the entire
steering range.
The idle speed must not change.
» If the idle speed changes:
–
Adjust the play in the throttle cable. (
Содержание Freeride 250 R AUS 2014
Страница 1: ...REPAIR MANUAL 2014 Freeride 250 R EU Freeride 250 R AUS Art no 3206188en...
Страница 2: ......
Страница 102: ...17 LIGHTING SYSTEM INSTRUMENTS 100 Set the speedometer p 95...
Страница 216: ...32 SPECIAL TOOLS 214 Pin 200687 10 Art no T605 Clamping stand 200638 10 Art no T612S...
Страница 222: ...3206188en 3206188en 10 2013 KTM Sportmotorcycle AG 5230 Mattighofen Austria http www ktm com Photo Mitterbauer KTM...