2
SETUP
3
2.1
Unpacking and setting up the vehicle
Preparatory work
–
Remove the carton.
201911-10
Main work
–
Remove the adhesive tape in the upper area of the motorcycle.
201912-10
–
Roll down the film at the sides.
Info
To avoid damaging the motorcycle during unpacking, leave the other films
on the vehicle until you have finished work on the vehicle.
–
Remove the separate enclosure and unpack it. Check the separate enclosure for
completeness.
–
Check the vehicle for transport damage.
201913-10
–
Remove the controls from the transport holder. Remove the screws and handlebar
clamps. Remove the transport holder.
201914-10
–
Remove the right hand guard.
–
Position the controls on the right half of the handlebar. Tighten the screws.
Guideline
Remaining screws, chassis
M5
6 Nm (4.4 lbf ft)
Remaining chassis screws
M6
10 Nm (7.4 lbf ft)
Info
Position the holding lug of the switch unit in the drill hole of the handlebar.
–
Mount the right hand guard.
201915-10
–
Position the handlebar.
Marking
1
on the scale on the handlebar is situated in the middle of the han-
dlebar clamp.
–
Position the handlebar clamps. Tighten the screws evenly.
Guideline
Screw, handlebar clamp
M8
20 Nm
(14.8 lbf ft)
–
Check the throttle grip for smooth operation.
Содержание 990 Adventure AUS/UK 2012
Страница 2: ......