3
WORK
8
Preparatory work
–
Switch off all power consumers and switch off the engine.
–
Remove the seat. (
–
Remove the battery. (
S01013-10
Main work
–
Connect the battery charger to the battery. Switch on the battery charger.
Battery charger (58429074000)
You can also use the battery charger to test rest potential and start potential of the
battery, and to test the alternator. With this device, you cannot overcharge the bat-
tery.
Info
Never remove lid
.
Charge the battery with a maximum of 10% of the capacity specified on the
battery housing
.
–
Switch off the battery charger after charging and disconnect from the battery.
Guideline
The charge current, charge voltage and charge time must not be exceeded.
Charge the battery regularly when the
motorcycle is not in use
3 months
Finishing work
–
Install the battery. (
–
Mount the seat. (
–
Set the clock. (
3.5
Installing the battery
S00621-11
Main work
–
Insert the battery into the battery compartment with the terminals facing rearward.
Battery (YTZ10S)
–
Position retaining bracket
and mount and tighten screws
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
S00623-10
–
Position washer
, positive cable
, and ABS connection cable
.
–
Mount and tighten screw
.
Guideline
Screw, battery terminal
M6
4.5 Nm
(3.32 lbf ft)
S00622-11
–
Position positive terminal cover
.
–
Position washer
and negative cable
, and mount and tighten the screw.
Guideline
Screw, battery terminal
M6
4.5 Nm
(3.32 lbf ft)
Содержание 690 SMC R 2016 Series
Страница 1: ...SETUP INSTRUCTIONS 2016 690 SMC R Art no 3213429en ...
Страница 2: ......