18
ENGINE
165
Preparatory work
–
Carefully lubricate all parts before assembling.
–
Check the transmission. (
Main work
303334-11
–
Secure the main shaft with the toothed end facing downward in the vise.
Guideline
Use soft jaws
–
Mount needle bearing
1
.
–
Mount 6th-gear idler gear
2
.
–
Mount stop disk
3
and lock ring
4
.
–
Mount 3rd/4th-gear sliding gear
5
with the small gear wheel facing downward.
–
Mount lock ring
6
and stop disk
7
.
–
Mount needle bearing
8
.
–
Mount 5th-gear idler gear
9
.
–
Mount 2nd-gear fixed gear
bk
and stop disk
bl
.
–
Finally, check all gear wheels for smooth operation.
18.4.24 Assembling the countershaft
Info
Use new lock rings with every repair.
Preparatory work
–
Carefully lubricate all parts before assembling.
–
Check the transmission. (
Содержание 300 EXC
Страница 2: ......
Страница 227: ...225...
Страница 283: ...33 SPECIAL TOOLS 281 Assembly tool 200791 10 Art no T150S Nitrogen filling tool 300574 10 Art no T170S1...
Страница 289: ...3206179en 3206179en 09 2013 KTM Sportmotorcycle AG 5230 Mattighofen Austria http www ktm com Photo Mitterbauer KTM...