SET
‑
UP
3
2.1
Unpacking and setting up the vehicle
600643-01
–
Remove the box and the plastic packaging.
Info
To avoid damaging the motorcycle during the setup, leave the protective foil
on the the vehicle until you have finished.
–
Check the vehicle for transport damage.
–
Unpack the separate enclosure and check its contents on the basis of the enclosure
list.
100303-01
–
Remove the operating elements from the transport holder. Remove the screws and
handlebar clamps. Remove the transport holder.
100318-10
–
Remove the M8 screw from the right hand guard.
100306-10
–
Position the operating elements on the right half of the handlebar.
Info
The routing of cables and Bowden cables can be seen in the figure.
100305-10
–
Position the handlebar.
The mark
1
of the scale on the handlebar should be in the center of the han-
dlebar clamp.
–
Position the handlebar clamps. Fit and evenly tighten the four screws.
Guideline
Screw, handlebar clamp
M8
20 Nm
(14.8 lbf ft)
Loctite
®
243™
600645-01
–
Position the operating elements on the left half of the handlebar. Fit the screws.