
Instruction Manual of
Programmable Power Controller (KT-PPC)
REV
1.6E
PAGE : 18 OF 25
Doc No: TIR9402-30-D01
210*297(mm)
KTE CO., LTD
TI-06(R0)
PPC
I/O TABLE
TYPE : INPUT 01 No. 2/4
TER.NO.
SIGNAL NAME
SYMBOL
I
N
P
U
T
01
01 No.1 GEN (ACB OPEN SW.)
INP 02.4
CS11 OPEN
02 No.2 GEN (ACB OPEN SW.)
INP 02.5
CS21 OPEN
03 No.3 GEN (ACB OPEN SW.)
INP 02.6
CS31 OPEN
04 AUTO LOAD SHARING
INP 02.7
43-77 AUTO
05 No.1 GEN READY TO START
INP 03.0
ENG1 READY
06 No.2 GEN READY TO START
INP 03.1
ENG2 READY
07 No.3 GEN READY TO START
INP 03.2
ENG3 READY
08 No.1 GEN RUN
INP 03.3
114X RUN
09 No.2 GEN RUN
INP 03.4
214X RUN
10 No.3 GEN RUN
INP 03.5
314X RUN
11 No.1 GEN STOP
INP 03.6
105X STOP
12 No.2 GEN STOP
INP 03.7
205X STOP
13 No.3 GEN STOP
INP 04.0
305X STOP
14 No.1 GEN ACB CLOSE
INP 04.1
CB1 CLOSE
15 No.2 GEN ACB CLOSE
INP 04.2
CB2 CLOSE
16 No.3 GEN ACB CLOSE
INP 04.3
CB3 CLOSE
17 GEN. VOLTAGE BUILD UP
INP 04.4
84G
18 X
19 X
20 PC RUN
PC RUN
21 No.1 GEN ACB TRIP (OCR. RPR)
INP 05.0
CB1 TRIP
22 No.2 GEN ACB TRIP (OCR. RPR)
INP 05.1
CB2 TRIP
23 No.3 GEN ACB TRIP (OCR. RPR)
INP 05.2
CB3 TRIP
24 HEAVY LOAD (PWC)
INP 05.3
HEAVY LOAD
25 LIGHT LOAD (PWC)
INP 05.4
LIGHT LOAD
26 HIGH POWER (PWC)
INP 05.5
HIGH LOAD
27 ACB OPEN COMMAND (PWC)
INP 05.6
O POWER
28 BUS ABNORMAL (PWC)
INP 05.7
BUS ABN
29 ACB NON CLOSE (ASD)
INP 06.0
NON CLOSE
30 AUTO SYNCHRO FAIL (ASD)
INP 06.1
SYNCH FAIL
31 PREF. TRIP
INP 06.2
PREF TRIP
32 BUS NO VOLT
INP 06.3
BUS NO VOLT
33 REQU.1 (BIG MOTOR START)
INP 06.4
34 REQU.2 (BIG MOTOR START)
INP 06.5
35 REQU.3 (BIG MOTOR START)
INP 06.6
36 X