5 Installation at Site
23 of 44
Hya-Solo D
1951.831/06-EN
5.5.1 Sizing the power cable
Determine the cross-section of the power cable based on the total rated power
required.
5.5.2 Connecting the pressure booster system
ü
The data on the name plate has been checked. The pressure booster system must
be suitable for operation on the available power supply network.
(
ü
The wiring diagram is available.
1. Connect terminals L1, L2, L3, PE and N in accordance with the wiring diagram.
2. Connect the potential equalisation conductor to the terminal on the baseplate
marked with the earthing symbol.
1
2
Fig. 5:
Connecting the potential equalisation conductor
1 Earthing terminal
2 Baseplate
3. Connect the dry running protection device. (
5.5.3 Connecting the dry running protection device
ü
The original operating manual of the dry running protection device is on hand.
1. Fit the dry running protection device in accordance with the supplied original
operating manual. Connect it in the control unit in accordance with the supplied
original operating manual.
Содержание Hya-Solo D
Страница 1: ...Pressure Booster System Hya Solo D From Series 2021w39 Installation Operating Manual...
Страница 42: ......
Страница 43: ......