5 Installation at Site
15 of 32
COBRA-TDC01/03
8194.8/02-EN
5 Installation at Site
5.1 General information/Safety regulations
The consultant, construction company or operator are responsible for positioning
and installing the valves. Planning errors and installation errors may impair the
reliable function of the valves and pose a substantial safety hazard.
WARNING
Damage to pressure enclosure or add-on parts
Leakage from or rupture of the valve
Valve/add-on parts not functional
▷
Check the valve for in-transit damage prior to installation.
▷
Check any add-on parts for in-transit damage.
▷
Do not install damaged valves.
5.2 Installation position
The valves should preferably be installed in horizontal pipes. When installing them in
vertical pipes, make sure that the flow direction is upward. In the unpressurised
condition, the valve disc will then be closed by its own weight.
Fig. 2:
Vertical and horizontal installation position of COBRA-TDC01/03
DANGER
Dead-end valve
High-pressure hazard!
Risk of burns!
▷
Protect the valve against unauthorised and/or unintentional opening.