7 Servicing/Maintenance
26 of 40
BOA-H Mat P
7.3 Dismantling the valve
7.3.1 General information/Safety regulations
WARNING
Hot surface
Risk of injury!
▷
Allow the valve to cool down to ambient temperature.
WARNING
Unqualified personnel performing work on the valve
Risk of injury!
▷
Always have repair work and maintenance work performed by specially trained,
qualified personnel.
Always observe the safety instructions and information. (
In the event of damage you can always contact our service departments.
7.3.2 Preparing the valve
1. Interrupt power supply and make sure it cannot be switched on again
unintentionally.
2. Depressurise and drain the valve.
3. Dismantle the pneumatic actuator as specified in the actuator's operating
manual.
7.3.3 Removing the stem seal
7.3.3.1 Removing the PTFE V-packing
545
45-6
416
950
920.2
722
161
200
350
Fig. 7:
Removing the PTFE V-packing
ü
The pneumatic actuator has been removed.
1. Undo and remove stuffing box screw 45-6.
2. Undo bonnet nuts 920.3.
3. Lift bonnet 161 off body 100.
Содержание BOA-CVP H
Страница 1: ...Automated Globe Valves BOA H Mat P Installation Operating Manual...
Страница 38: ......
Страница 39: ......
Страница 40: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 7136 8 02 EN...