![KSB 88980/48 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/ksb/88980-48/88980-48_operating-and-maintenance-instructions-manual_2006491074.webp)
Page 6
FIBREGLASS WETWELL INSTALLATION
NON-TRAFFIC LOAD (Figure H-1)
TRAFFIC LOAD COVER (Figure H-2)
Rebar Reinforcement per
Certified Engineer Design
300mm
min
Fibreglass Flat Top with
Rectangular Top Opening
250mm max
Backfill
(per Section D, Page 4)
600mm
min
Street
cover
Rebar Reinforcement per
Engineer of Record Design
250mm Max
Base - Use 300 Soil Cement
Mix with Compressive
Strength of 1mpa
Subbase - Use 300mm
Minimum Low PI Select
Fill Approved by a
certified Engineer.
Compacted to 95%
Standard Compaction
Backfill
(per Section D, Page 4)
Copyright © 2009 GEBEL Aquasafe. • All Rights Reserved • May 2010 • Pub. No. MAN 2000
Goodnal STP ST041 Pre Treatment (KSB Amenities Pump Station OM Manual) Vendor Manual
Q-Pulse Id VM372
Active 29/10/2013
Page 74 of 94