![Krone Big Pack 1270 XC Скачать руководство пользователя страница 103](http://html1.mh-extra.com/html/krone/big-pack-1270-xc/big-pack-1270-xc_original-operating-instructions_2004793103.webp)
Operation
9
Securing/releasing knotter shaft
9.5
BiG Pack 1270 XC
Original Operating Instructions 150000748_01_en
103
9.5
Securing/releasing knotter shaft
I
2
1
I
II
II
2
BP000-107
ü
The machine is shut down and safeguarded,
.
Securing
In order to secure the knotter shaft, move the brake lever (2) from position (I) to position (II)
and lay it down on the journal (1).
Releasing
In order to release the knotter shaft, move the brake lever (2) from position (II) to position (I).
9.6
Connecting twine rolls with each other (single knotter)
The procedure of connecting the twine rolls with each other is identical for the left and right
machine side. Therefore, the procedure described below for connecting the twine rolls applies
to both machine sides.
ü
The machine is shut down and safeguarded,
.
ü
.
BP000-063
Make sure that the lower twines never cross over each other.
Содержание Big Pack 1270 XC
Страница 29: ...Safety 2 Safety labels on the machine 2 5 BiG Pack 1270 XC Original Operating Instructions 150000748_01_en 29 ...
Страница 370: ...II T P LS I III IV T P S1 S2 M1 M2 V1 V2 P1 B1 A1 B2 B1 T1 T T4 P 180 bar B36 100 bar B11 B35 150101911_00 2 4 ...
Страница 372: ...B17 K9 K11 K12 B B1 A A1 1 2 3 K13 3 4 5 1 2 150101911_00 3 4 ...
Страница 374: ...B17 K11 1 2 150101911_00 4 4 ...
Страница 376: ... LUFXLW GLDJUDP GRFXPHQW QR YHUVLRQ ODUJH VTX XDUH EDOHU L 3 LJK 6SHHG XW 9DUL XW 3 3 1 0HGLXP RPIRUW IURP PDFKLQH QR ...