![Krick COMTESSE Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/krick/comtesse/comtesse_building-instruction_2003808048.webp)
Status September 2018
Page 16
©
Krick Modelltechnik, Knittlingen, Germany
Cut the railing support 9.13 to length.
Fit slides and supports with washers 9.14 and
push them together with split pins 9.15.
Align and solder the parts as described for the
bow pulpit using the spacer blocks.
Drill and solder the holes for the pins 9.16 of
the railing cables.
Bend the holders 9.17 for the life jackets and
solder them to the upper rear pulpit rail.
Fig. rear baskets with holders for life jackets
Now you can paint the pulpit and the two stern
pulpits.
Stage 10, Railing and bathing ladder, parts
10.1 - 10.11
Once the hull has been painted, the bow and
stern pulpits and railing supports can be at-
tached.
Drill the holes for the railing supports 10.1 with
2 mm at a distance of 120 mm, starting at the
bow pulpit. Insert the stanchions,
do not glue
them.
Fig. Installing railing stanchions
Cut the railing cables 10.2 to approx. 1m (extra
length).
Provide the railing cables with a crimp sleeve
10.3 one after the other, push it through the
front split pins 9.9 and push the end through
the crimp sleeve and press it together.
Guide the railing pull through the railing
supports, aligning the supports.
Tension the railing cable slightly, thread it
through the rear split pin 9.16 and press it to-
gether with a crimp sleeve 10.3. Now the rail-
ing stanchions can also be glued.
Bend the U-shaped bathing ladder bracket
10.4 according to drawing "10 A".
Push on and solder the rungs 10.6 provided
with 2 split pins.
A soldering aid consisting of a small board with
corresponding spacer strips helps soldering.
Fig. soldering aid bathing ladder
Fit the lower rung with split pins 10.5 and insert
into the ends of the brackets and solder tightly.
120 mm
120 mm
Содержание COMTESSE
Страница 29: ...Stand September 2018 Seite 29 Krick Modelltechnik Knittlingen Bild 2 Ruder ...
Страница 30: ...Stand September 2018 Seite 30 Krick Modelltechnik Knittlingen Abb 5 Mast ...
Страница 31: ...Stand September 2018 Seite 31 Krick Modelltechnik Knittlingen ...
Страница 32: ...Stand September 2018 Seite 32 Krick Modelltechnik Knittlingen ...
Страница 61: ...Status September 2018 Page 29 Krick Modelltechnik Knittlingen Germany Fig 2 Rudder ...
Страница 62: ...Status September 2018 Page 30 Krick Modelltechnik Knittlingen Germany Fig 5 Mast ...
Страница 63: ...Status September 2018 Page 31 Krick Modelltechnik Knittlingen Germany Fig 6 Booms ...
Страница 64: ...Status September 2018 Page 32 Krick Modelltechnik Knittlingen Germany ...
Страница 94: ...Version Septembre 2018 Page 30 Krick Modelltechnik Knittlingen Vue 2 Gouvernail ...
Страница 95: ...Version Septembre 2018 Page 31 Krick Modelltechnik Knittlingen Vue 5 Mât ...
Страница 96: ...Version Septembre 2018 Page 32 Krick Modelltechnik Knittlingen ...
Страница 97: ...Version Septembre 2018 Page 33 Krick Modelltechnik Knittlingen ...