VS-211X
/
VS-411X
Quick Start
P/N:
2 9 0 0 - 3 0 1 2 4 7 QS
Rev:
3
Scan for full manual
VS-211X and VS-411X Quick Start Guide
This guide helps you install and use your
VS-211X
/
VS-411X
for the first time.
Go to
www.kramerav.com/downloads/VS-411X
to download the latest user manual and check if firmware
upgrades are available.
Step 1: Check
what’s in the box
VS-211X
/
VS-411X
4K Auto Switcher
4 Rubber feet
1 Power adapter and cord
1 Quick start guide
Step 2: Get to know your VS-211X / VS-411X
The terms HDMI, HDMI High-Definition Multimedia Interface, and the HDMI Logo are trademarks or registered trademarks of HDMI Licensing Administrator, Inc.
#
Feature
Function
1
PROG Micro USB Connector
Connect to upgrade the firmware.
2
SETUP 4-way DIP-Switches
Set the operation DIP-switches (see
).
3
IN Buttons
Press to select an HDMI input (button lights orange).
4
OUT LED
Lights green when an HDMI output is connected.
5
ON LED
Lights green when the device receives power.
6
HDMI
™ IN Connectors
Connect to an HDMI source (2 for
VS-211X
, 4 for
VS-411X
).
7
HDMI™ OUT Connector
Connect to an HDMI acceptor.
8
AUDIO OUT3.5mm Mini Jack
Connector
Connect to an unbalanced stereo audio acceptor.
9
REMOTE IN Terminal block Connector
Connect to contact closure switches by momentary contact between the desired
pin and common GND pin to select an input.
10
5V DC Power Connector
Connect to the power supply and to the mains electricity.
Step 3: Install VS-211X / VS-411X
Install
VS-211X
/
VS-411X
using one of the following methods:
•
Attach the rubber feet and place the unit on a flat surface.
•
Fasten a bracket (included) on each side of the unit and attach it to a flat surface
www.kramerav.com/downloads/VS-411X
•
Mount the unit in a rack using the recommended rack adapter
www.kramerav.com/product/VS-411X
•
Ensure that the environment (e.g., maximum ambient temperature &
air flow) is compatible for the device.
•
Avoid uneven mechanical loading.
•
Appropriate consideration of equipment nameplate ratings should be
used for avoiding overloading of the circuits.
•
Reliable earthing of rack-mounted equipment should be maintained.
•
Maximum mounting height for the device is 2 meters.