
15 of 40
Installation
Field Wiring
Á
Disconnect all 240VAC power before commencing
any field wiring or solenoid valve connection
L
Strip approx. 6mm of insulation and place under the loosened
screw, tighten gently and check the cable is firmly held
1. Connect one cable from the terminals to each solenoid valve
2. Complete the circuit by
looping
a common cable to all
valves and connecting to the COMMON (
C
) terminal
1
3
5
7
C
MASTER
VALVE
PUMP
ST1
ST2
ST3
ST4
ST5
ST6
ST7
ST8
COM
COM
COM
TEST
SENS
COM
C
P
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8