background image

page 14

Parts Required:

K1  x1

1#

x2

K1

K

1#

1#

K1

Step  10

Connect outside roof connctor (Part K1)to inside roof (Part K)using screw 1# 

                     as shown in diagram

.

Содержание KZAHG1012GRA

Страница 1: ...Assembly Manual 10 x12 Hardtop Gazebo With Double Roof Kozyard LLC Products Copyright 2016 2022 Kozyard LLC All Rights Reserved...

Страница 2: ...se of construction you may need touse a drill 2 You will need one or more stepladders 5 Use the hex keys in the box 2 1 Two or more people are required for assembly 7 Do not fully tighten screws prior...

Страница 3: ...K1 L M N B DESCRIPTION Pole 4 2 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 1 1 1 Beam Joint Bar Sidewall Track Beam Beam Beam Jointer Bar Jointer Bar Jointer Bar Union Bar Corner Cover Joint Cover Joint...

Страница 4: ...Finishing End Finishing Bar Spacer Finishing Bar Solidifying Bar Solidifying Bar Iron Angle Iron Angle Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Pan...

Страница 5: ...Panel Roof Panel Mosquito Sidewall Solid Sidewall Strap Metal Bracket Metal Bracket Metal Bracket Metal Bracket Metal Bracket Screws Screws Screws Hook Screws Screws Screws Screws Screws Screws Allen...

Страница 6: ...A x4 L x4 1 x12 A L A L 1 1 1 page 4 Parts Required Step 1 Set up poles Part A with stand plates Part L using screws 1 as shown in diagram X4...

Страница 7: ...C B F D E E D F 1 1 1 1 page 5 Connect Part C and Part B into one beam using union bar Part F with screws 1 Connect Part E and Part D into one beam using union bar Part F with screws 1 as shown in di...

Страница 8: ...the finished beam part E part D using screws 1 as shown in diagram Replicate the same steps for parts C2 B2 attaching them to the finished beam C B using screws 1 Attach parts E1 D1 to finished beam...

Страница 9: ...2 2 2 x16 3 3 3 3 3 x16 A A A A B C B C D E D E page 7 Step 4 Parts Required Use screws 2 3 to connect poles and beams together as shown in diagram X4 X4...

Страница 10: ...J2 J2 J2 J2 J1 J1 J1 J1 1 J1 J2 J2 x4 J1 x4 1 1 1 x32 page 8 Parts Required Affix the frame with corner solidifying bars Parts J1 J2 using screws 1 as shown in diagram Step 5...

Страница 11: ...9 9 9 9 G x4 x24 H page 9 Parts Required Step 6 Finish connecting beams using corner covers Part G and screws 9 as shown in diagram Affix middle beams using joint cover Part H and screws 9 and 1 as sh...

Страница 12: ...4 H1 4 4 x6 x6 x7 x7 H1 H1 Step 7 C2 B2 E2 D2 Put 6 hooks to each slot of sidewall track part C2 Part B2 Put 7 hooks to each slot of sidewall track part E2 Part D2 After finishing hooks into tracks t...

Страница 13: ...B C D E page 11 Parts Required with silicone rubber to seal after finishing the assembly it will be better for no water leaking in heavy rain Reminder X4 H2 x1...

Страница 14: ...4 Step 8 Set up roof frame Connect the inside roof connect Part K with the corner roof bar Part M using screws 1 Attach corner roof bar Part M to main frame using screw 1 as shown in diagram Attach fi...

Страница 15: ...page 13 Parts Required 1 x12 N x4 N 1 N N N N N N N N 1 1 1 1 Step 9 Attach roof bar Part N to main frame using screw 1 as shown in diagram...

Страница 16: ...page 14 Parts Required K1 x1 1 x2 K1 K 1 1 K1 Step 10 Connect outside roof connctor Part K1 to inside roof Part K using screw 1 as shown in diagram...

Страница 17: ...page 15 Parts Required Step 11 Cover metal bracket Part Z Z1 Z2 to roof panels as shown in diagram...

Страница 18: ...V4 V5 V6 R 1 V1 V2 V3 V4 V5 V6 1 1 V1 V2 T1 1 V3 V4 V5 V6 T2 1 R 1 R R R Step 12 Push the roof panels Part v1 v2 v3 v4 v5 v6 to upper roof as shown in diagram Attach finishing bars Part T1 T2 to uppe...

Страница 19: ...ars to roof corner bar using iron angle Part U3 and screw 1 as shown in diagram Affix solidifying bars Part U0 U together to roof bar using iron angle Part U4 and screws 1 as shown in diagram 1 x24 U...

Страница 20: ...page 18 Parts Required Step 14 Cover metal bracket Part Z Z3 Z4 to roof panels as shown in diagram...

Страница 21: ...page 19 Parts Required...

Страница 22: ...art S sliding down during assembly W3 or X4 The back view of Part W3 or Part X4 Part S with adhesive tape X4 page 20 W1 W2 W3 W4 W5 W6 X1 X2 X3 X4 X5 X6 X7 X8 W1 W2 W3 W4 W5 W6 X1 X2 X3 X4 X5 X6 X7 X8...

Страница 23: ...Affix roof panels using screws and spacers Part S as shown in diagram Attention Put on one roof panel and fasten it accordingly before attaching second roof panel 5 x64 6 x8 7 x28 10 x4 S x104 10 S 6...

Страница 24: ...rts Required Q1 x2 Q2 x2 1 x4 11 x8 P1 x2 P1 P1 P1 Q1 Q2 Q1 Q2 Q1 Q2 1 1 11 11 11 11 Step 16 P1 Q1 Q2 Perspective Attach net frames Part P1 Q1 Q2 to finishing bars Part P Q using screws 1 11 as shown...

Страница 25: ...page 23 Parts Required Step 17 Hang up mosquito sidewalls and solid sidewalls as shown in diagram Y1 x2 Y2 x2 Y5 x2 Y6 x2 Y5 Y5 Y6 Y1 Y2 Y5 Y5 Y5 Y6 Y6 Y6 Y1 Y1 Y1 Y1 Y2 Y2 Y2...

Страница 26: ...8 In the end Check all screws are fixed tightly before using page 24 When you close the curtain please refer to below steps to fix with poles as shown in diagram Yb X4 Y5 Y6 Y5 Y6 Y1 Y2 Y5 Y6 Y1 Y2 Y5...

Страница 27: ...66 10808 6th ST Unit 100 Rancho Cucamonga CA 91730...

Отзывы: