Control Board Removal and Installation
SECTION 8
FIREPLACE SETUP
#SFD-36
R.6 February 2022
44
HUSSONG MFG. CO., INC.
KOZY HEAT FIREPLACES
8.5 Control Board Removal and Installation
WARNING: Avoid burns or personal property damage by using
appropriate protection to remove any components if the burner and/
or pilot have been burning.
WARNING: DO NOT operate this appliance without the sealing gasket
(located under the control board) in place. If the sealing gasket is
damaged, it must be replaced.
CAUTION: Check all connections for leaks with soapy water, whether
field or factory made.
8.5.1 Control Board Removal
1. Disconnect electrical power.
2. Locate the manual valve installed by your qualified service
technician. Turn the manual valve clockwise to the OFF position.
3. Remove the safety barrier and glass frame assembly.
4. Remove logs.
5. Remove pilot shield
6. Remove the burner assembly. There are (2) screws located on
the left and right side, and (3) screws located at the back of the
firebox. Release the burner tube venturi off of the burner orifice
and remove from firebox.
7. Remove the burner heat shield. There are (2) screws located at
the back firebox wall.
8. Remove light kit assembly (2) screws.
9. Remove and save (10) screws securing control board to
firebox floor.
10. Lift the control board out of the firebox, being careful not to
damage the sealing gasket underneath.
8.5.2 Control Board Installation
1. Place the control board in the firebox, aligning the holes in
control board with the holes and alignment screws in firebox
bottom.
VERIFY SEALING GASKET IS IN PLACE.
2. Secure the control board with (10) screws previously removed.
3. Reinstall light kit assembly (2) screws.
4. Reinstall burner heat shield (2) screws.
5. Position the burner tube venturi over the burner orifice and
secure the burner assembly to the firebox with (5) screws
previously removed.
6. Reinstall the pilot shield.
7. Reinstall log set.
8. Reinstall the glass frame assembly and safety barrier.
9. Turn the manual valve counterclockwise to the ON position.
10. Reconnect electrical power.
11. Verify proper log placement, operation of fireplace, and any
electrical components.
Remove burner assembly
Remove burner heat shield (2) screws
Remove light kit asssembly (2) screws
Remove control board (10) screws
FIGURE 8.4
Control Board Removal and Installation