background image

INTRODUCTION 

7

SP-41-L MANUAL REV#2 OCT 2017

Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces

1.0  INTRODUCTION

1.1  Appliance Certification

Laboratory: OMNI-Test Laboratories in Portland, Oregon 
Standards: 
ANSI Z21.88-2016/CSA 2.33-2016, Vented Gas Fireplace Heaters
CGA 2.17-M91 (R2014), Gas-Fired Appliances for Use at High 
Altitudes
This installation must conform with local codes, or in the absence 
of local codes, with the National Fuel Gas Code, ANSI Z223.1/
NFPA 54, or the Natural Gas and Propane Installation Code, CSA 
B149.1.

1.2  Requirements for the 

Commonwealth of Massachusetts

The following requirements reference various Massachusetts 
and national codes not contained in this manual.

For all sidewall horizontally vented gas fueled equipment installed 
in every dwelling, building or structure used in whole or in part 
for residential purposes, including those owned or operated 
by the Commonwealth and where the side wall exhaust vent 
termination is less than (7) feet above finished grade in the area 
of the venting, including but not limited to decks and porches, the 
following requirements shall be satisfied:

1.2.1  Installation of Carbon 

Monoxide Detectors

At time of installation of side wall horizontally vented gas fueled 
equipment, the installing plumber or gas-fitter shall observe that 
a hard wired carbon monoxide detector with an alarm and battery 
back-up is installed on the floor level where the gas equipment is 
to be installed. In addition, the installing plumber or gas-fitter shall 
observe that a battery operated or hard wired carbon monoxide 
detector is installed on each additional level of the dwelling, 
building or structure served by the side wall horizontal vented gas 
fueled equipment. It shall be the responsibility of the property 
owner to secure the services of qualified licensed professionals 
for the installation of hard wired carbon monoxide detectors.
In the event that the side wall horizontally vented gas fueled 
equipment is installed in a crawl space or attic, the hard wired 
carbon monoxide detector with alarm and battery back-up may 
be installed on the next adjacent floor level. In the event that 
the requirements of this subdivision can not be met at the time 
of completion of installation, the owner shall have a period of 
thirty (30) days to comply with the above requirements; provided, 
however, that during said thirty (30) day period, a battery 
operated carbon monoxide detector with an alarm shall be 
installed.

1.2.2  Approved Carbon Monoxide Detectors

Each carbon monoxide detector as required in accordance with 
the above provisions shall comply with NFPA 720 and be ANSI/
UL 2034 listed and IAS certified.

1.2.3  Signage

A metal or plastic identification plate shall be permanently 
mounted to the exterior of the building at a minimum of eight (8) 
feet above grade directly in line with the exhaust vent terminal 
for the horizontally vented gas fueled heating appliance or 
equipment. The sign shall read, in print no less the one-half inch 
(½) in size, “GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL 
OBSTRUCTIONS”. 

1.2.4  Inspection

The state or local gas inspector of the side wall horizontally 
vented gas fueled equipment shall not approve the installation 
unless, upon inspection, the inspector observes carbon monoxide 
detectors and signage installed in accordance with the provisions 
of 248 CMR 5.08 (2) (a) 1 through 4.

1.2.5  Exemptions

The following equipment is exempt from 248 CMR 5.08 (2) (a) 1 
through 4: The equipment listed in Chapter 10 entitled “Equipment 
Not Required To Be Vented” in the most current edition of NFPA 
54 as adopted by the Board; and Product Approved side wall 
horizontally vented gas fueled equipment installed in a room or 
structure separate from the dwelling, building or structure used in 
whole or in part for residential purposes.

1.2.6  Manufacturer Requirements

1.2.6.1  Gas Equipment Venting System Provided

When the manufacturer of Product Approved side wall horizontally 
vented gas equipment provides a venting system design or 
venting system components with the equipment, the instructions 
provided by the manufacturer for installation of the equipment and 
the venting system shall include:
•  Detailed instructions for the installation of the venting system 

design or the venting system components; and

•  A complete parts list for the venting system design or venting 

system.

1.2.7  Gas Equipment Venting 

System NOT Provided

When the manufacturer of Product Approved side wall horizontally 
vented gas equipment does not provide the parts for venting the 
flue gases, but identifies “special venting systems”, the following 
requirements shall be satisfied by the manufacturer:
•  The referenced “special venting systems” instructions shall 

be included with the appliance or equipment installation 
instructions and;

•  The “special venting systems” shall be Product Approved by 

the Board, and the instructions for that system shall include a 
parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved 
side wall horizontally vented gas fueled equipment, all venting 
instructions, all parts lists for venting instructions, and/or all 
venting design instructions shall remain with the appliance or 
equipment at the completion of the installation.

Содержание SP-41 LOG

Страница 1: ...factured home USA only or mobile home where not prohibited by local codes This appliance is only for use with the type of gas indicated on the rating plate This appliance is not convertible for use wi...

Страница 2: ......

Страница 3: ...safety We offer our continual support and guidance to help you achieve the maximum benefit and enjoyment from your Kozy Heat gas fireplace Jim Hussong President Dudley Hussong Board Chairman Homeowner...

Страница 4: ......

Страница 5: ...Systems 22 7 2 Venting Requirements 22 7 3 Use of Elbows 22 7 4 Vent Restriction 22 7 5 Vent Installation 23 7 6 700 2 Series Direct Vent Termination Kit s 25 7 7 Vent Heat Shield Assembly Installati...

Страница 6: ......

Страница 7: ...or as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI UL 2034 listed and IAS certified 1 2 3 Signage A metal or plastic identification plate shall be permanentl...

Страница 8: ...nifold Pressure High 3 8 WC 0 95 kPa 11 WC 2 74 kPa Manifold Pressure Low 1 1 WC 0 27 kPa 2 9 WC 0 72 kPa Orifice Size DMS 41 53 2 2 1 Altitude Adjustment This appliance may be installed at higher alt...

Страница 9: ...Mfg Co Inc Kozy Heat Fireplaces 2 3 Appliance Dimensions 5 133mm 153 8 390mm 93 8 237mm 241 8 611mm 37 940mm 343 8 874mm 40 1035mm 34 878mm 15 380mm LEFT SIDE TOP VIEW FRONT VIEW RIGHT SIDE GAS LINE...

Страница 10: ...barrier shall be replaced with Hussong Mfg s barriers for this appliance Only doors certified with the appliance shall be used IMPORTANT Consider the height of hearth finish material when building a...

Страница 11: ...l produce when determining a location 3 2 Stand off Assembly and Installation WARNING The top stand offs brackets provide the required minimum clearance to the header The 1 in 25mm top stand off flang...

Страница 12: ...p to ceiling 25 in 653 mm A 45 projection from appliance sides 0 in 0 mm Appliance sides to adjacent sidewall 4 1 2 in 114 mm Fireplace enclosure floor to 3 4 in 19 mm trim 37 1 8 in 943 mm Mantel 6 i...

Страница 13: ...Inc Kozy Heat Fireplaces 3 3 1 Typical Installation Options 15 394mm 14mm 41 1041mm 54 1384mm 6mm 121 8 308mm 267 8 682mm 38 978mm 15 394mm 14mm 41 1041mm 41 1041mm TYPICAL VERTICAL INSTALLATION TYPI...

Страница 14: ...peting vinyl or any other combustible material other than wood Framing dimensions should allow for wall covering thickness and fireplace facing materials Adjust rough opening size as necessary to main...

Страница 15: ...appliance 3 6 Recess Construction WARNING All clearances to venting must be maintained Mounting a television above a fireplace has become a common practice Television surface temperatures are affected...

Страница 16: ...l length Please consult the vent manufacturer s instructions to determine the elbow dimension used for installation Adjust the wall pass through rough opening dimensions to maintain clearance requirem...

Страница 17: ...aming regardless of finishing material used 1 Locate the nailing tabs on the right and left sides of the fireplace necessary to accommodate the thickness of your facing material 2 Bend out the 4 naili...

Страница 18: ...6 in 152 mm above the appliance to a maximum 6 in 152 mm depth of a non combustible mantel Follow projection 1 in 25 mm up for every 1 in 25 mm deeper 4 2 2 Finishing Recommendations NOTE The surface...

Страница 19: ...ure testing of that system at pressures in excess of psi 3 5 kPa For test pressures equal to or less than psi 3 5 kPa the appliance must be isolated from the gas supply piping system by closing its in...

Страница 20: ...lat to 6 12 1 0 0 30 Over 6 12 to 7 12 1 25 0 38 Over 7 12 to 8 12 1 5 0 46 Over 8 12 to 9 12 2 0 0 61 Over 9 12 to 10 12 2 5 0 76 Over 10 12 to 11 12 3 25 0 99 Over 11 12 to 12 12 4 0 1 22 Over 12 12...

Страница 21: ...et to building or the combustion air inlet to any other appliance 12 in 30 cm 9 in 23 cm K Clearance to mechanical air supply inlet 6 ft 1 83 m 3 ft 91 cm above if within 10 ft 3 m horizontally Massac...

Страница 22: ...ill vary depending upon venting configuration and the type of fuel used Provide a means for visually checking the vent connection to the appliance after the fireplace is installed A minimum of 1 in 25...

Страница 23: ...Terminations Min Vertical Max Vertical Minimum Vertical Length Maximum Vertical Length 3 ft 914 mm 50 ft 15 2 m Table 7 2 Natural Gas and Propane Co linear 3 x 3 Vertical Terminations Min Vertical Max...

Страница 24: ...Coaxial Horizontal Vent Terminations Min Vertical and Min Horizontal and Max Horizontal Minimum Vertical Venting Minimum Horizontal Run HMIN Maximum Horizontal Run HMAX 90 elbow 6 in 152 mm 3 ft 914 m...

Страница 25: ...listed as non combustible per ASTM E 136 Do not proceed with installation until wall pass through is insulated 2 Mount the required wall pass through G to the exterior wall and seal 3 Apply a liberal...

Страница 26: ...tion 2 Align the 2 slots on the vertical heat shield flanges with corresponding screw holes located in front of the flue outlet on the top of the fireplace 3 Secure the vertical vent heat shield to th...

Страница 27: ...ier slightly into slots and allow the tabs to lower into position To remove safety barrier lift the screen up and out of slots 8 2 Glass Frame Assembly WARNING Do not operate this fireplace with the g...

Страница 28: ...numbers are located on the bottom of each log Refer to the following instructions and illustrations for proper log placement 1 Align the holes in the bottom of log SP41 1 with the mounting pins on the...

Страница 29: ...ing control board to firebox floor 10 Lift the control board out of the firebox being careful not to damage the sealing gasket underneath 8 4 2 Control Board Installation 1 Place the control board in...

Страница 30: ...operly grounded three prong receptacle Do not cut or remove the grounding prong from this plug 9 1 Electrical Specifications This appliance when installed must be electrically grounded in accordance w...

Страница 31: ...wireless remote ON button 11 If the appliance will not operate follow the instructions To Turn Off Gas To Appliance and call your service technician or gas supplier OPERATING INSTRUCTIONS NOTE When th...

Страница 32: ...e main ON OFF rocker switch to ON position for remote control operation of the main burner and fireplace features 10 3 Reset the System for Manual Operation 1 Set the ON OFF rocker switch to OFF posit...

Страница 33: ...to the OFF position 2 After approximately 2 seconds move the switch to the ON position The ignition sequence will start again 10 6 1 2 Remote Control ON OFF Key 1 Press the remote control ON OFF key...

Страница 34: ...rom a spark to pilot system to the standing pilot option The standing pilot will keep the firebox warm and establish a draft in the vent which allows the main burner to ignite with less air flow disru...

Страница 35: ...as a room thermostat The thermostat can be set to a desired temperature to control a room s comfort level To activate this function 1 Press the thermostat key The LCD screen will display a temperature...

Страница 36: ...ace has been turned off Manual mode Fan s will operate at previous setting There is no delay in start up or stop time 10 8 9 Accent Light Kit if applicable The light intensity can be adjusted through...

Страница 37: ...e it is between the minimum and maximum recommended pressure settings 4 Turn off burner and pilot 5 Disconnect hose and tighten the inlet IN pressure tap by turning screw clockwise Screw should be snu...

Страница 38: ...Set Venturi Openings Fuel Air Shutter Opening Natural Gas 1 8 3 mm OPEN Propane 1 2 13 mm OPEN 11 2 1 1 Venturi Adjustment NOTE If soot is present on the glass check log positioning before adjusting...

Страница 39: ...screws at the firebox ceiling securing the baffle Lift the baffle out of slots on the firebox back wall 3 Bend the tabs on the restrictor plate included in components packet to approximately 80 angle...

Страница 40: ...in gas line Pilot will not stay lit No propane in tank Check propane tank Refill if necessary Low gas pressure Consult a plumber or a gas supplier Can be caused by situations such as a bent line too n...

Страница 41: ...ent 8 2 Glass Frame Assembly on page 27 Improper venturi setting Venturi air shutter may need to be opened slightly to allow more air into the gas mix 11 2 1 Burner Venturi on page 38 Incorrect vent c...

Страница 42: ...reinstall per instructions provided with installation 7 0 Venting on page 22 Performed by Qualified Service Person Frequency Annually Action Examination of the vent system is required The flow of comb...

Страница 43: ...safety system Pilot or Flame rectification device Visually check pilot light when in operation Inspect and ensure the lighting of the main burner occurs within 4 seconds of the main gas valve opening...

Страница 44: ...r Orifice 53 700 253 Pilot Assembly Natural Gas 700 551 Conversion Kit Natural Gas NCK SP41L S Pilot Assembly Propane 700 551 1 Conversion Kit Propane LCK SP41L S Transmitter Remote Control 700 408 Bu...

Страница 45: ......

Страница 46: ...ng Manufacturing Co Inc s behalf any additional obligation of liability connected with the unit It is expressly agreed and understood that this warranty is Hussong Manufacturing Co Inc s sole obligati...

Страница 47: ......

Страница 48: ...efective component s It is expressly agreed and understood that this Lifetime Warranty is Hussong Manufacturing Co Inc s sole obligation and original purchaser s exclusive remedy for defective firepla...

Отзывы: