14 FRAMING
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
#SP-34 LE & MV R.5 January 2020
3.6 Wall Enclosure Rough Opening
WARNING: Provide adequate clearance in front of the fireplace for
barrier removal, component access, gas line installation, service
access, etc.
NOTE: The construction of the fireplace wall enclosure must comply
with local building codes and all clearances as outlined in this manual.
NOTE: Cold air transfer area. The fireplace wall enclosure should be
constructed in a manner to prevent cold air from entering the room
and outside walls should be insulated.
•
Framing dimensions should allow for wall covering thickness
and fireplace facing materials. If using a hearth, adjust the rough
opening size as necessary to maintain minimum clearance
requirements.
•
Framing dimensions for minimum horizontal terminations are
outlined Section 3.7 Vent Termination Framing on page 15.
•
If masonry (optional) is to be used, prepare the foundation
necessary for the full masonry load. A lintel must be used over
the top of the appliance to support the added weight of the
masonry construction above the fireplace.
•
If installing optional fan assembly #SP-028, it is easier to install
before unit installation. Please refer to Section 9.3 #SP-028
3.6.1.1 TV Recess Construction
WARNING: All clearances to venting must be maintained.
Mounting a television above a fireplace has become a common
practice. Television surface temperatures are affected by mantel
depth, ceiling heights, and wall and mantel construction material.
Most television manufacturers specify in their instructions that a
television should not be installed on, near, or above a heat source.
Television location rests solely on the homeowner. It is the home
owner’s responsibility that the preferred TV mounting and mantel
design will not exceed the listed maximum operation temperature of
their electronic goods.
Tests performed determined that surface temperatures did not exceed
150°F (66°C) when a 4¼” (108mm) deep recess is constructed above the
fireplace. See illustration below.
Figure 3.4, Framing Dimensions
33
½
”
(851mm)
34
½
”
(876mm)
14”
(356mm)
33
½
”
(851mm)
34
½
”
(876mm)
14”
(356mm)
42”
(1067mm)
4
¼
”
(108mm)
TV Recess Construction
Single vertical header board
is required to maintain
clearances to combustibles