#CLW-ST R.1 February 2021
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
FRAMING
33
Figure 3.25, Top Vented (all three sides) Cavity Crown Molding Installation
76”
(1930mm)
Min
Max
12”
(305mm)
1
½
”
(38mm) Min
1
½
”
(38mm) Min
Max
12”
(305mm)
*must maintain 1
½
” (38mm) clearance for full
length of crown molding/trim projection
Ceiling
Enclosure
Air discharge opening entire top
(all three sides)
at 1
½
” min
Front View
Side View
1
½
”
(38mm)
Min
TOP VENTED CAVITY INSTALLATION ONLY
3.9.5.1 Top Vented Cavity Option
Alternative Installations
•
Figure 3.25 shows the installation of crown molding or similar
trim work that goes up to the edge of the air discharge opening.
12” (305mm) is the maximum length of the molding or trim
projection and you must maintain 1-1/2” (38mm) clearance for
the full length of crown molding/trim projection. This molding or
trim cannot decrease the minimum opening requirement.