
6
1. Hang the boiler up in a vertical position
on fixing screws with the inlet and
outlet pipes to the bottom, maintaining
clearances from the walls and the ceiling.
2. Connect the boiler to the central heating
system equipped with a cut-off valves.
3. Fill the central heating system with
treated water or non-freezing liquid what
influences on the durability of immersion
heaters.
4. Vent the central heating system.
5. Connect a boiler to the electrical system.
6. Assembly and connect the room regulator
sensor and other devices cooperating,
according to the „Connection point
external sensors and devices”.
7. After completing the above steps start
the boiler, set up boiler language and
maximum output and vent the pump
[Configuration> Pump> Venting> Turn on]
.
8. Set the maximum temperature factor in
the installation
[Configuration> Central
heating> Max boiler temp.].
Assembly and installation
159
215
316
126
50
22
min. 150
50
716
64
93
12
min 150
min 60
Depending on the model of purchased boiler and the electrical installation on site, the
boiler should be connected in accordance with the drawings below.
2, 4, 6, 8 kW 230V 1N~ 4 to 24kW 400V 3N~ 230V 3N~
Содержание EKCO.M3
Страница 35: ...PL 090B_f 35...