14
5. System Installation
.
5-1. Installation and Testing
1. Take out your JetCon 1701GP-U Industrial Gigabit PoE Injector from the
package box.
2. Check if the DIN-Rail clip is attached to the JetCon 1701GP-U. If the DIN-Rail
clip is not attached to the JetCon 1701GP-U, refer to
DIN-Rail Mounting
section for DIN-Rail installation.
3. To place the JetCon 1701GP-U on the DIN-Rail track or wall, refer to the
Mounting Installation
section.
4. Pull the terminal blocks off the JetCon 1701GP-U and wire the power lines.
Refer to the
Wiring the DC Power Inputs
section for how to wire the power
inputs.
5. PWR1 and PWR2 dual power inputs can be connected to power sources
simultaneously. When the primary power source fails (the default setting is
PWR1), the system will automatically switch to the secondary power source
(PWR2), preventing any power interruption.
Both of Power 1 and Power 2 support positive electricity electricity power
system. Please notice the power system for power 1 and power 2 only accept
positive electricity power system at one time
6. Check the LEDs of PWR1 and PWR2 to make sure that JetCon 1710GP-U is
operating normally.
7. Use Category 5e straight through Ethernet cables with RJ-45 connectors to
connect network devices.
8. Connect one side of an Ethernet cable with a RJ-45 connector to the JetCon
1701GP-U
’s Ethernet port (RJ-45 port), and the other side of the ethernet cable