1 INITIAL SITUATION
1
Place the frame on the floor,
1
with the legs facing upwards
SETUP INSTRUCTIONS
2 PREPARATION
2.a
Place the folding legs in an upright position as far as they go
2.b
The tubes that run towards the back of the table are used to attach
2.b
K&M’s various accessories (see Technical Information). We
2.b
recommend, that the ends of the tubes that are not being used be
2.b
covered with caps.
3 ASSEMBLY the U-PROFILE FEET
3.a
Place the U-profile foot - leading with the open end
3.a
into the respective foot tube and screw it together...
3.b
...using the hexagon screw
3.b.1
3.b
and the wing nut
3.b.2
.
3.c
The head of the screw
3.b.1
must be securely
3.c
placed in the hexagon of the outer tube.
3.d
NOTE: all four U-profiles are to be assembled
3.d
in the same manner. Count the drill holes 1-10.
4 MOUNT the FLOOR ADJUSTMENT SCREW
4.a
First turn the hexagon nut
4.a.1
as
4.a
far as it will go into the thread of
4.a
the floor adjustment screw
4.a.2
.
4.b
Then place this approx. 15 mm into the feet.
5 SECURE FOOT FRAME - USING THE FOLDING STRUTS
5
The stand is now placed on its legs
5.a
NOTE: If the folding table struts are not properly set there is a
5.a
RISK OF WEDGING/PINCHING!
5.a
Be sure to only touch the safety guards of the folding table struts.
5.b
The safety guards are then pressed inwards...
5.c
...until the folding table struts click into place. Then test to ensure
5.c
that the folding table struts are properly clicked into place.
5.c
The legs should not fold inwards.
5.d
To be able to return the legs to the original position pull on the
5.d
safety guard of the folding table struts until they have been released.
6 FLOOR ADJUSTMENT
6
SCREW
6.a
First adjust the floor
6.a
adjustment screws one
6.a
after the other to ensure
6.a
that the stand is stable
6.a
and balanced.
6.b
Secure this position
6.b
by tightening the
6.b
lower counter nuts.
8 ADHERE THE RUBBER PADS
8
Remove the protective paper and
8
adhere the rubber pads (4x) to the
8
frame according to instrument
8
requirements.
9 WIDTH ADJUSTMENT
9.a
Loosen the knurled screws below the vertical tube
9.b
Set the desired width and tighten the knurled screws
7 HEIGHT ADJUSTMENT
7.a
- via the 4 U-Profile-Feet in 10 positions (see section
3
) from 600 - 1000 mm
6.a
7.b
- via the floor adjustment screws
6