
KÖNIG & MEYER
GmbH & Co. KG
Kiesweg 2, 97877 Wertheim, www.k-m.de
17725-000-55 Rev.02 03-80-884-00 10/14
TECHNICAL DATA
SETUP INSTRUCTIONS
17725 Floor Stand
for SPOTLIGHTS with
M10 Threaded bolt
Sturdy - compact - quick
The stand sports so-called
CROSS LEGS and offers a series of advantages
- 4 point support with rubber feet
- robust and durable metal construction
- folds flat for space-saving storage
- extremely simple handling; tools not required
- the spotlight is attached via a threaded bolt
SAFETY NOTES
Thank you for choosing this product. The instructions provide directions
to all of the important set up and handling steps. We recommend you
keep these instructions for future reference.
CHECK, MAINTENANCE, CLEANING
- in the event of workstation maintenance pay attention to possible risks
-
(wedging, bumping into the stand)
- to care for the product use a damp cloth
FAULT-FINDING (F) and REPAIR (R)
F: Stand is not stable R: Check the surface
R: Replace the rubber feet
R: Check to ensure the struts are straight
F: Spotlight is not stable R: Tighten the screws on the stand and
R:
spotlight
Setting up the 17725 Floor Stand is very easy. All parts come
pre-assembled. All that needs to be done is to place the stand in
position.
1
Loosen the lower wing nut and...
2
...turn the leg struts until they form a 90° angle.
2
(= best sturdiness); now re-tighten wing nut
1
.
3
Screw off the star knob nut from the threaded bolt
4
Place the lamp support arms on the threaded bolt and...
5
...secure the spotlight by screwing on the star knob nut.
6
Loosen the star knob nut to position the spotlight to the desired
6
position. The desired position is then secured by tightening the
6
star knob nut
5
.
Disassembly of the stand: after removing the spotlight
7
Put the struts over each other.
The floor stand is compact and easy to transport.
- Be sure that the surface will bear the load and is suitable and level.
- Place the two struts of the cross legs at a 90° angle to each other;
-
any other positioning of the struts will result in instability.
- Ensure the screws are properly tightened.
- The fact that the product is collapsible and adjustable, can result in the
-
risk of pinching/wedging. Careful and attentive handling during setup,
-
operation, and disassembly is indispensable.
Material
Struts: Steel, powder coating, black
Washer, screw: Steel, galvanized
Handle: PA-6, black
End caps, disk: TPE, black
max. Weight
Spotlight with swivel support arms
Dimensions
Setup dimensions: ø 352 x 50 mm
Package Dimensions: 352 x 45 x 50 mm
Weight
0.7 kg
Packaging
Polybag 125 x 450 mm
SETUP
SPOTLIGHT
SPACE REQUIREMENT
DISASSEMBLY
&
PRODUCT