
Stream Punch
2
bizhub PRO C65hc Additional Information
5
2.1.2
Space Requirements
To ensure that machine operation, consumables replenishing, part replace-
ment, and regular maintenance can easily be performed, adhere to the rec-
ommended space requirements detailed below.
Be sure to choose a level and solid floor for the installation place.
64.1
37.3
29.9
12.0
13.8
3.9
6.9
3.9
40.2
15.8
8.1
21.4
10.0
143.7
4.6
FS-521 - RU-506 - GP-501 - RU-504 - Main body - PF-602
(Unit: inches)
64.1
48.5
37.3
29.9
12.0
13.8
15.7
3.9
6.9
3.9
40.2
15.8
8.1
21.4
10.0
159.4
4.6
FS-521 - FD-503 - RU-506 - GP-501 - RU-504 - Main body - PF-602
(Unit: inches)
64.1
37.3
29.9
12.0
13.8
3.9
6.9
3.9
40.2
15.8
8.1
30.9
21.4
10.0
174.6
4.6
FS-521 - LS-505 - RU-506 - GP-501 - RU-504 - Main body - PF-602
(Unit: inches)
Содержание bizhub PRO C65hc
Страница 2: ......
Страница 4: ......
Страница 17: ...Stream Punch 2 bizhub PRO C65hc Additional Information 13 6 Close the stream punch front door ...
Страница 23: ......
Страница 24: ...A0Y8990100 2009 6 ...