2.1 Flow of Unpacking and Installation
2-2
2.1
Flow of Unpacking and Installation
This section describes the workflow from unpacking to installing the delivered product.
Item
Outline
Unpacking
Unpack goods after arrival.
For further details, refer to
Removing Protective Parts
Remove the protective parts from the machine interior.
For further details, refer to
“2.3 Removing Protective Parts”
Changing Operation Panel
Installation Position
(Vertical Installation
Configuration Only)
For the vertical installation configuration, change the installation position
of the operation panel.
For further details, refer to
“2.4 Changing Operation Panel Installation
.
Moving to and Fixing at
Installation Location
Move the machine and fix it at the installation location.
For further details, refer to
“2.5 Moving to and Fixing at Installation
.
Checking of Input Voltage
Check the input voltage.
For further details, refer to
“2.6 Checking of Input Voltage”
Connecting Power Cable
Connect the power cable.
For further details, refer to
.
Checking Startup and
Shutdown
Check that the machine starts up and shuts down properly.
For further details, refer to
“2.8 Checking Startup and Shutdown of Unit”
.
Unpacking and Completion
of Installation
0404YF220A.book 2 ページ 2009年8月20日 木曜日 午後1時26分
Содержание 0404
Страница 38: ...0404YF220A book 26 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 47: ...0404YF220A book 1 ページ 2009年8月20日 木曜日 午後1時26分 ...
Страница 48: ...0404YF220A 0404YF220A 20090827MD 20090827MD ...