2-33
12. OPERATION
12. OPERATION
3.
Operate work equipment control lever
3
slowly to move the
bucket cylinder and lift cylinder to the end of their stroke.
4.
Operate the bucket and lift arm for 30 seconds each in turn.
5.
After carrying out the warming-up operation, check that the
gauges and pilot lamps are normal.
If any abnormality is found, carry out repairs.
Operate the machine under light load until engine water tem-
perature gauge
4
and HST oil temperature gauge
5
are in the
white range.
6.
Check that there is no abnormal exhaust gas color, noise, or
vibration.
If any abnormality is found, carry out repairs.
Содержание WA20-2
Страница 39: ...1 30 MEMO ...
Страница 40: ...2 1 OPERATION ...
Страница 42: ...2 3 10 GENERAL VIEW 10 GENERAL VIEW 10 2 GENERAL VIEW OF CONTROLS AND GAUGES ...
Страница 114: ...3 1 MAINTENANCE ...
Страница 132: ...3 19 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS ...
Страница 134: ...3 21 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS ...
Страница 136: ...3 23 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS ...
Страница 175: ...3 62 MEMO ...
Страница 176: ...4 1 SPECIFICATIONS ...
Страница 178: ...5 1 OPTIONS ATTACHMENTS ...
Страница 182: ...5 5 28 EQUIPMENT WITH CAB 28 1 SWITCHES 1 ROOM LAMP SWITCH ON Lights up OFF Goes off OFF ON AD051820 ...
Страница 188: ...4 3 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Страница 190: ...4 5 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Страница 192: ...4 7 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Страница 194: ...4 9 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Страница 195: ...4 10 MEMO ...