PC27R-8
20-41
TESTING AND ADJUSTMENTS
CONTROL AND REGULATION OF THE PRESSURES
IN THE HYDRAULIC CIRCUITS
1. Control of operating pressure (unloading valve)
1 - Remove the plug (1) of pump P1 and mount a
pressure adapter.
2 - Connect a pressure gauge
E1
(60 bar).
3 - Start the engine and bring it up to high idling with
all levers in neutral position.
4 - Check the pressure.
H
Normal pressure:
35
w
5 kg/cm
2
(34.3
w
4.9 bar)
The unloading valve cannot be re-adjusted. If
the pressure differs from the normal value the
valve must be substituted.
2. Control the operating pressures of the working
equipment and machine travel
1 - Remove the plug (1) of pump P1 and mount a
pressure adapter.
2 - Connect a pressure gauge
E2
(400 bar) or
E3
(600 bar).
3 - Start the engine and bring it up to high idling.
4 - Check the pressure for each movement with the
command lever at the end of its stroke and with
the pressure stabilised.
To check the pressure of the working equip-
ment, push the piston to the end of its stroke.
To check the pressure of machine travel, in-
sert a block "
A
" between the chassis and
the sprocket wheel.
H
Normal pressures:
Working equipment and travel:
210 10 kg/cm
2
(206 10 bar)
3. Check the operating pressure of the turret
swing
1 - Set the main relief valve of the control valve to a
value higher by 20 bar than the maximum pres-
sure to be checked.
2 - Remove the caps (1) of the swing motor and
mount the pressure adapters.
3 - Connect a pressure gauge
E2
(400 bar) or
E3
(600
bar).
Insert the turret swing locking-pin.
4 - Start the engine and bring it up to high idling.
5 - Check the pressure for a swing to the right and a
swing to the left, bringing the lever of the left-hand
PPC valve to the end of its stroke and with the
pressure stabilized.
H
Normal pressure:
215 5 kg/cm
2
(211 5 bar)
6 - Restore the setting of the main relief valve.
PC20R-8 PC27R-8
RKPA2250
1
E
1
RKPA2260
1
E
3
RKPA3870
A
RKPA2270
1
E
3
Содержание F30791
Страница 1: ......
Страница 2: ...40 28 PC15R 8...
Страница 4: ...00 2 PC20R 8 PC27R 8...
Страница 17: ...GRUPPO 10...
Страница 18: ...40 28 PC15R 8...
Страница 32: ...10 14 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 34: ...10 16 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...10 18 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 61: ...10 43 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 86: ...10 68 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 94: ...10 76 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 98: ...10 80 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 108: ...10 90 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 110: ...10 92 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 112: ...10 94 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 114: ...10 96 PC20R 8 PC27R 8...
Страница 115: ...GRUPPO 20...
Страница 116: ...40 28 PC15R 8...
Страница 131: ...PC27R 8 Standard value Permissible value Max 20 Max 30 2 Max 5 2 Max 5 2 Max 5 FOR THE MACHINE 20 15 PC20R 8 PC27R 8...
Страница 180: ...H 20 64 TESTING AND ADJUSTMENTS PC20R 8 PC27R 8...
Страница 181: ...GRUPPO 30...
Страница 182: ...40 28 PC15R 8...
Страница 262: ...30 80 REMOVAL AND INSTALLATION PC20R 8 PC27R 8...
Страница 263: ...GRUPPO 40...
Страница 264: ...40 28 PC15R 8...
Страница 279: ...40 15 PC20R 8 PC27R 8 RKP01661 Sezione A A 44 1w4 9 Nm 4 5w0 5 kgm 44 1w4 9 Nm 4 5w0 5 kgm Section A A...
Страница 287: ...40 23 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Страница 298: ...40 34 PC20R 8 PC27R 8...