AKD Installation | 9 Electrical Installation
9.13.5 Emulated Encoder Output (EEO)
The drive calculates the motor shaft position from the cyclic- absolute signals of the primary
feedback, generating incremental-encoder compatible pulses from this information. Pulse out-
puts on the SubD connector X9 are 3 signals, A, B and Index, with 90° phase difference (i.e.
in quadrature, hence the alternative term “A quad B” output), with a zero pulse.
The resolution (before multiplication) can be set by the DRV.EMUERES parameter. Use the
DRV.EMUEZOFFSET parameter to save the zero pulse position within one mech-
anical turn. The drivers operate from an internal supply voltage.
tv max. 30ns
Connection Diagram
144
Kollmorgen | kdn.kollmorgen.com | October 2017
Содержание AKD series
Страница 162: ...AKD Installation 9 Electrical Installation Wiring diagram X24 162 Kollmorgen kdn kollmorgen com October 2017 ...
Страница 179: ...9 20 6 CAN Bus Wiring AKD Installation 9 Electrical Installation Kollmorgen kdn kollmorgen com October 2017 179 ...
Страница 214: ... AKD Installation 11 Index 214 Kollmorgen kdn kollmorgen com October 2017 ...