Kohler Toobi K-96024T-PF100-Q73 Скачать руководство пользователя страница 6

-5-

2. This product is not suitable to be installed

outdoors, and shall keep away from ultraviolet
light, heat, fuel, and various chemicals as far
as possible. It shall be protected from frost
crack, so when the ambient temperature is
below 5 , you shall take protective
measures for the filters.

3. When winding the raw material belt, you need

to wind sufficiently and uniformly.

4. When tightening the hexagonal nut with a

wrench, you need to ensure that other
components will not rotate with it.

5. You shall carefully observe for leaks or

leakages after the installation is completed.

6. When installing this device, you shall observe

the right direction of the system water flow!
Make sure that the flow direction in the
pipeline is consistent with the direction of the
arrow on the filter body during the installation.

In all the installation, maintenance and
schematic diagrams in this manual, Toobi 200 is
taken as the example, unless otherwise stated.
The schematic diagram is for reference only,
and please adhere to the actual product instead.

This product is for household pre-filter or water
protection, and is usually installed behind the
main inlet valve or meter (as shown in Figure ).
The following installation instructions take the
installations of PPR pipe connecting road as an
example. If the household water pipes are
connected by metal hard pipes, you need
external detours according to the actual situation.

2.

5

3.

4.

5.

6.

200

(

)

PPR

Fig.

1373811-T01-

B

Содержание Toobi K-96024T-PF100-Q73

Страница 1: ...4T PF110 Q73 K 96024T PF120 Q73 K 96024T PF130 Q73 K 96024T PF200 Q73 K 96024T PF210 Q73 Copyright Kohler China Investment Co Ltd 1373811 T01 B KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN RO...

Страница 2: ...the water meter of the inlet to protect the safety and cleanliness of the downstream piping and equipment of the system The pre filter is compact in structure easy to operate and can be installed in...

Страница 3: ......

Страница 4: ...tle 18 Sewage adapter 1 2 3 4 5 6 7 8 9 10 O 11 12 13 14 15 16 17 18 1 Union 2 Union nut 3 Union seals 4 Brass valve head 5 Filter bottle O ring 6 Transparent filter bottle Black PF120 130 7 Filter as...

Страница 5: ...per before installing 1 4 III TECHNICAL PARAMETERS Model Toobi 100 110 120 130 Basic 100 110 120 130 Toobi 200 210 Regulator 200 210 Additional features NO Adjusting water pressure and making it stabl...

Страница 6: ...the right direction of the system water flow Make sure that the flow direction in the pipeline is consistent with the direction of the arrow on the filter body during the installation In all the inst...

Страница 7: ...tall the product Note that you shall take over the remaining water with a container as shown in Figure Step Two As shown in Figure melt the PPR pipe end and fitting B with the PPR pipe welding machine...

Страница 8: ...readed union assembly in the annex Note that you shall keep the direction of water flow and the direction of the arrow on the pre filter product in consistency as shown in Figure Step Five Slowly open...

Страница 9: ...filtrated by the filter screen through the transparent filter cartridge At this time if the accumulated impurities affect the water outlet quantity and pressure of the household water equipment you c...

Страница 10: ...d from the spring cover Leakage Whether the water pressure is reduced Whether the water inlet valve is fully open Check whether the filter is clogged partly Whether the water inlet valve is fully open...

Страница 11: ...e wrench Union 2 Union nut 2 Union gasket 2 Sewage adapter Pressure gauge Manual No 100 110 200 210 1 2 3 4 5 6 7 8 2 2 2 2 2 2 10 Note Do not attempt to disassemble the machine at your own risk when...

Страница 12: ...ximately 10 kg sq cm 3 The water inlet temperature is between 5 to 45 4 The environment temperature for installation is between 5 to 45 5 The device is not affected by irresistible external force such...

Страница 13: ......

Отзывы: