background image

   

                                                                          

1265596-2A-A          

                                                                                                                                          2  

  

   

                                                                          

1265596-2A-A           

                                                                                                                                         3

  

INSTALLATION

1. How to Install the Faucet

To perform installation, installer must provide G1/2

˝ 

female supply fittings(1), spaced 150mm apart and horizontally. The supply 

fittings should be vertical and not beyond the finished wall. Hot supply pipe must be located on the left.

Flush the water supply pipes thoroughly to remove debris. Install the two offset connectors(2) into the hot and cold supply pipes. 

Use appropriate thread sealants or thread tape on pipe threads. 

Adjust the center-to-center distance between the connectors to 150mm and horizontally. They should extend 40~45mm beyond 

the finished wall. Thread the escutcheons(3) onto the connectors until they are against the finished wall. Put the washers(4) into 

the nuts(5), thread the nuts to connectors. Tighten the nuts with strap wrench or soft cloth between product and regular wrench.

CLEANING INSTRUCTIONS

All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with clean soft cloth. Many 

cleaners may contain chemicals, such as ammonia, chlorine, toilet cleaner etc. which could adversely affect the finish and are 

not recommended for cleaning.

Do not use abrasive cleaners or solvents on Kohler faucets and fittings. 

2. How to Install the Shower Column

Select a location in vertical wall to install shower column according

to rough-in dimensions.

Drill the lower hole as anchors(6) diameter and lower base(8-1) 

position in the finished wall (

NOTE:

 The arrow in the base is 

upward). Press anchors into the hole, secure the base by the 

screws(7). 

Rehearse the slide bar kit(9) installation for the upper base(8-2) 

mounting location determination. Slide the tube joint(10) onto the 

slide bar kit, and connect them to the base(

NOTE:

 The arrow in 

the base is up). Install the screws(12) into the tube joint with the 

hex wrench(11), and tighten them.
Place the slide bar and the body 

against the finished wall. Connect 

the lower base and the diverter body 

kit(13). Position and tighten them by

hex wrench. Mark the hole of upper 

base(8-2) with a pencil. Uninstall the 

slide bar kit and tube joint.

(

NOTE:

 Don’t lose the screws.)

Drill holes on the mark. Press the 

anchors into the holes. Secure the 

upper base(8-2) by the screws. 

Install the tube joint(10) to the base 

(8-2) and tighten them by screws. 

Reinstall the slide bar kit with 

escutcheons(14) to the bases. 

Tighten the screws with the hex 

wrench. Screw the escutcheons with 

the bases until against the finished wall.

Install the tube kit(15) into the slide 

bar kit. Install the nut(16) onto the 

tube kit with soft cloth between 

internal hole of the nut and the tube

kit. Then screw the nut onto the slide

bar kit with strap wrench or soft cloth 

between the nut and regular wrench.

6

7

12

8-2

14

6

7

12

8-1

14

13

16

15

10

11

9

3. How to Install the Handspray & Hose

Remove the guards on the outlet connectors of 500mm 

length hose(18). Connect the outlet(17) to the connector

(19) with the hose(18), and tighten.

Turn the diverter handle(20), run hot and cold water for 

about one minute to remove any debris.

Remove the guards on the outlet connectors of 1500mm 

length hose(21). Tighten one connector(21-1) of the hose

(21) to the connector(22). Put the check valve(23) into the 

handspray(24) inlet if needed. Remove the washer from 

another connector(21-2), replace with the washer(25).

Tighten the handspray to the connector(21-2) of the hose. 

Ensure that all connections are tight. Ensure that the handles are in the off position. Turn on the 

drain and main water supply, and check for leaks. Repair as needed.

Remove the aerator(30) with the key(29) provided. Run hot and cold water through spout about 

one minute to remove any debris. Clean the aerator assembly. Shut off the faucet. Reinstall the 

aerator assembly.

INSTALLATION CHECKOUT

4. How to Install the Showerhead

Turn the diverter handle(20), run hot 

and cold water for about one minute to 

remove any debris before the shower

head(26) is installed. 

Take out the washer(28) and install the 

restrictor(27) into the showerhead as 

shown if needed, reinstall the washer. 

Tighten the showerhead onto the tube 

kit outlet with strap wrench.

OPERATION INSTRUCTIONS

CARE AND MAINTENANCE

1

Hot

Cold

150mm

3

2

150mm

40~45mm

5

4

29

30

Verification and Setting

Make sure that the water feeds of the faucet have reach their highest temperature by letting the 

water run sufficiently. With the selector in position 37ºC, the temperature of the water coming out 

of the faucet must be within a range of 36ºC and 38ºC, as measured by a thermometer. If this is 

not the case, the installer can adjust the setting. Proceed with the setting as follows: Uninstall 

handle kit. With the faucet on “cold” normal water flow, slowly turn the temperature selector

(always in the same direction) until water at 37ºC is obtained. If the temperature goes over 38ºC, 

go back to the “cold” setting and set again. When the temperature is stabilized, without turning 

the cartridge spindle, make sure the reference number 37 mark on the temperature handle aligned 

with the round laser mark on the body. Tighten the screw with the screwdriver, put on the plug. 

Spindle

Round 

laser mark

Number 37

33

34

35

32

31

Stop assy

Cartridge

Cartridge

Fig.1

Fig.2

Stop pin

Stop pin

Notch

Notch

Fig.3

Fig.4

Groove

Round mark

Fig.5

Fig.6

After cleaning, install the “stop assy” back 

on the cartridge, adjusting the stop pin into 

the notch(Fig.4). Install the assy cartridge 

and stop in the body, adjusting the stop pin 

into the notch(Fig.5). 

NOTE: 

Do not turn the 

cartridge when reinstall it. If you turned it 

without carefully, you should adjust it and 

be sure that the round mark is correctly in 

line with the groove(Fig.6), or readjust as 

per the steps of verification and setting.

Install the temperature selector(without 

turning the spindle). Align the reference 

number 37 mark on the temperature handle 

with the round laser mark on the body. 

Tighten the handle with the screw. Put on 

the plug.

Very hard water can obstruct the filters 

protecting the thermostatic cartridge and 

reduce the flow of water. Please clean the 

cartridge as follows: Shut off the water 

supply of the faucet and open the water 

flow handle, then proceed to remove the 

cartridge. The cartridge is sensitive, 

please be careful.

Make sure the reference mark is aligned 

with number 37 before your action. 

Remove the handle kit(Fig.1), unscrew the 

nut and stopper(Fig.2). Removing the 

cartridge cautiously(Fig.3). Clean the 

thermostatic cartridge by soaking it in 

warm vinegar. 

The filters(31) protecting the 

faucet device may get obstructed 

and reduce water flow. When this 

happens, unscrew the bushes 

(33, left thread) by a wrench(32, 

12mm) and take out the nuts(34), 

filters(31) and the check valves 

(35) after removing the faucet. 

Clean the filters by soaking them 

in warm vinegar. Reinstall them 

as the figure.(

Note:

 Check valves 

should reinstall as original 

orientation).

21

21-2

21-1

18

17

23

24

25

19

20

22

28

27

26

Отзывы: