Kohler RDT ATS Скачать руководство пользователя страница 4

4

TT-1646 6/15

1.4 Relay Connections to an RXT

Combined Interface/Load

Management Board

This section applies to the RXT ATS equipped with the

combined interface/load management board.

For

models RDT ATS and RXT ATS equipped with the load

shed kit, go to Section 1.3.

See Figure 2 for cable specifications.

Note:

See the RXT Operation and Installation Manual

for load priority and load management operation

information.

Load management priorities are determined by the

control relay output connections to the RXT

interface/load management board. Typically, Load A is

added first and shed last.

1. Disconnect power to the transfer switch.
2. If the combined interface/load management board

is not already connected to the generator set,

follow the instructions in TP-6807, RXT ATS

Operation and Installation Manual, to connect the

interface board to the generator set controller and

current transformer.

3. Connect customer-supplied leads to the control

relay output terminals on the combined

interface/load management board. See Figure 5

and Figure 6.

4. See Figure 7 for the coil connection screws on the

relay. Connect the control leads from the RXT

combined interface/load management board to the

relay coil using ring terminals X-283-2.

5. See Figure 6 and Figure 8 for source and load

connection points on the relay.

a. Connect the line side of the relay to the source

power circuit as shown in Figure 6.

b. Connect the load side of the relay to the

non-essential load circuits as shown in

Figure 6.

6. Connect 120 VAC power to connections AC1 and N

on interface board connection TB2 as shown in

Figure 6.

Note:

The AC power supply circuit must be

protected by an appropriately sized fuse or

circuit breaker.

7. Connect the load side of the relay to the

non-essential load circuits. Two (2) 120 VAC loads

(shed simultaneously) or a single 240 VAC load

can be wired to each relay.

8. For all other load control connection instructions,

see the Operation/Installation Manual provided

with the RXT automatic transfer switch.

9. Proceed to Section 1.5.

Relay *

Interface Board TB2 Connection

Load A

A and N

Load B

B and N

Load C

C and N

Load D

D and N

* Load add/shed priority is based on the order of connection to

the interface board.

Figure 5

Relay Coil Control Connections to RXT

Combined Interface/Load Management

Board

GM95546

Figure 6

Relay Connections to RXT Combined Interface/Load Management Board

Содержание RDT ATS

Страница 1: ...AC relays require a customer supplied voltage source Check the electrical requirements of the customer provided equipment prior to installation to determine the wire size and circuit protection required Verify that customer provided equipment complies with applicable local and national electrical codes Read the entire installation procedure and compare the kit parts with the parts list at the end ...

Страница 2: ... kit or TP 6807 RXT Operation and Installation Manual for load priority and load management operation information 1 1 Prevent the generator set from starting 1 Place the generator set master switch in the OFF position 2 Disconnect the utility power to the generator set 3 Disconnect the generator set engine starting battery ies negative lead first 1 2 Install the power relay modules 1 Identify a co...

Страница 3: ...on the relay Connect the control leads from the load shed kit to the relay coil using ring terminals X 283 2 5 See Figure 4 and Figure 8 for the source and load connections to the relay a Connect the line side of the relay to the source power circuit as shown in Figure 4 b Connect the load side of the relay to the non essential load circuits as shown in Figure 4 Two 2 120 VAC loads shed simultaneo...

Страница 4: ...ews on the relay Connect the control leads from the RXT combined interface load managementboard tothe relay coil using ring terminals X 283 2 5 See Figure 6 and Figure 8 for source and load connection points on the relay a Connect the line side of the relay to the source power circuit as shown in Figure 6 b Connect the load side of the relay to the non essential load circuits as shown in Figure 6 ...

Страница 5: ...e generator set engine starting battery negative lead last 3 Reconnect utility power to the generator set 4 Press the AUTO button on the generator set controller 5 Reconnect power to the transfer switch 2 Operation The power relay module operation is controlled by the load management device which is either a load shed kit or the RXT combined interface load management board The relay is normally cl...

Страница 6: ...6 TT 1646 6 15 Figure 7 Power Relay Module Dimensions ADV 8742 Sheet 1 of 2 ...

Страница 7: ...TT 1646 6 15 7 Figure 8 Power Relay Module Dimensions ADV 8742 Sheet 2 of 2 ...

Страница 8: ...M92008 1 Enclosure Base GM91999 1 Enclosure Cover GM92000 2 Screw Thread Forming GM92003 1 Gasket 2 56 ft GM92009 1 Relay Sub Assy GM92005 1 Decal GM97546 2 Terminal ring male 16 14 AWG X 283 2 2 Lead LK 1006 1515 4 Screw Phillips pan head thread form X 6071 2 1 Nut hex 1 4 20 X 81 8 1 Installation Instructions TT 1646 Availability is subject to change without notice Kohler Co reserves the right t...

Отзывы: