Fig.3
3
Fig.4
4
Fig.5
5
2.
3
2
2
3.
1
4
2
2. Preparations
As shown in Fig.3, unscrew the 2 screws on bottom of the
shelf and then remove the 2 hardware.
3. Fixing
Drill holes on the marked positions (in step 1) on the wall as
shown in Fig.4. Insert expansion screws into the drilled holes
and then fix the 2 hardware on the wall.
-3-
4.
2
2
2
2
5
4. Install Shelf
Align the 2 round holes on the shelf with the 2 rods and then
push the shelf forwards. Tighten the 2 screws removed in
step 2, as shown in Fig.5.
Note: The maximum load of the shelf is 6kg. Do
not overload.
Pull out hardware
Remove screw
Step 2
2
682
1
24
0.5
24
0.5
Step 2
2
Step 1
1
Step 1
1
1294185-T01-A