Kohler K-77404T-0 Скачать руководство пользователя страница 10

-9-

USER'S GUIDE

A. Button Function

A.

B. Time Setting

Under the heater mode, there is a delay of 20 secs after
the heater mode is stopped or switched to fan or
ventilation mode.
Under the fan mode, there is a delay of 3 secs after the
fan mode is stopped or switched to heater or ventilation
mode.
Under the ventilation mode, there is a delay of 3 secs
after the ventilation mode is stopped or switched to heater
or fan mode.
The defaulted duration time of heater, fan and ventilation
mode is 2 hrs.

!

!

!

!

B.

"

"

"

"

"

"

20

"

"

"

"

"

"

3

"

"

"

"

"

"

3

"

"

"

"

"

2

!

!

!

!

TROUBLESHOOTING

Problem

Diagnosis

Solution

Bathroom heater does not
work.

Wall controller break down.

A. Power failure.

D. The signal line route is interrupted.

B. Disconnected power cord.

A. The pilot lamp does not turn on.

C. Circuit breaker is

off

.

B. Fail to control the bathroom heater.

A. Wait until the power is restored.

D. Check the signal line route and ensure that it

is connected properly.

B. Connect the power cord into the junction box

of bathroom heater properly.

A. Ensure that the signal line is connected

properly.

C. Turn on the power at the breaker.

B. Connect the signal line and the bathroom

heater properly.

A.

D.

B.

A.

C.

B.

A.

D.

B.

A.

C.

B.

Heater: Turn on/off or switch to the heater mode.

/

"

"

"

"

Fan: Turn on/off or switch to the fan mode.

/

"

"

"

"

Ventilation

Turn on/off or switch to the ventilation mode.

/

"

"

"

"

Air Flow: Switch the air flow to fixed flow or swing flow (defaulted).

1322966-T01-B

Содержание K-77404T-0

Страница 1: ...lation and Homeowners Guide Underscore Bathroom Heater S300 S300 K 77404T 0 KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN ROAD JING AN DISTRICT SHANGHAI PRC POST CODE 200436 158 200436 1322966...

Страница 2: ...mplies with GB 4706 1 2005 GB4706 23 2007 and GB 4706 27 2008 please leave instructions for the consumer GB 4706 1 2005 GB4706 23 2007 GB 4706 27 2008 WARNING Risk of electrical shock WARNING Risk of...

Страница 3: ...ress Protection 2 2m min 3 2 2m min 3 43dB 43dB IPX2 Bathroom Heater IPX2 IPX4 Remote Control IPX4 SIMPLIFIED DIAGRAM OF THE UNIT Note Plaster or other ceiling opening dimension 275 X 275 mm 275 X 275...

Страница 4: ...he insulation of power cord Copper cord must be inserted into the pillar terminal hole and make sure all the cords under the terminal are inserted into the pillar terminal completely Suggest using a p...

Страница 5: ...Outlet window installation Fix the air exhaust pipe to the outlet window on the wall with the clamp as the preparation of bathroom heater installation Seal the pipe and the outlet window with foaming...

Страница 6: ...the roof shall be 200mm or above Ensure that the gap between the product edge and the wall is 300mm or above The power cord to the product shall have enough length for the installation The distance be...

Страница 7: ...r installation see the figures below 3 Match a keel lock with an L mounting bracket 4 Pre install the 4 matched L mounting brackets on the keel Make sure the installation clearance is appropriate The...

Страница 8: ...tighten the 8 BTP4 8 triangular self tapping screws and the columnar screws 5 BTP4 8 L 6 BTP4 8 8 7 Fix the ventilation outlet assembly on the body with one BTP4 8 triangular self tapping screws Then...

Страница 9: ...plates Installation finished 8 3 2 9 Power cord L N Wiring Terminal WALL CONTROLLER INSTALLATION Fix the wall controller frame and the base with two screws Then connect two signal lines with the wall...

Страница 10: ...ontroller break down A Power failure D The signal line route is interrupted B Disconnected power cord A The pilot lamp does not turn on C Circuit breaker is off B Fail to control the bathroom heater A...

Страница 11: ...ergent to clean casing or air louver 3 Never try to put a small screw driver or any other object into the holes of air Louver from outside This might cause damage to the interior parts and electric sh...

Страница 12: ...e AC power supply should be shut off before maintaining the products with AC power related 5 All electrical connection must be compliance with related regulation and codes 6 All installation staff sho...

Отзывы: